Laserfiche WebLink
r~ <br />_ __- =Golder <br />ASSOClc'~teS <br />October 1, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 3: September 19 through September 25, 2004 <br />Cresson Project Phase II-III Extension Construction Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Ina (Golder) is pleased to submit this summary of Construction Quality Assurance <br />(CQA) services performed for the Modified Amendment No. 7 boundary (Phase IUIII extension) <br />construction at the Cresson Project during the period of September 19 through September 25, 2004. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 29° F to 48° F, and highs ranged from 47° F to 66° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase II-III <br />extension construcfion. Ames conducted Phase II-III extension construction activities on four days of <br />this seven-day reporting period (September 19 through September 22, 2004). Poly-flex conducted <br />Phase II-III extension repairs on one day of this seven day reporting period (September 19, 2004). <br />Phase II-III Extension <br />Ames continued production of Drain Cover Fill (DCF) material at the screen plant by the secondary <br />crusher. <br />Ames commenced and completed hauling, placement and grading of DCF material into the Phase II-III <br />Extension adjacent to the southwest tie-in of Phases II and III. Ames placed DCF material per the <br />project plans onto approved geomembrane panels. <br />A map of the area worked during this reporting period is provided in Attachment C. <br />Phase II-III 3 September 19-September 25, 2004 043-2170 <br />