My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46582
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:34 PM
Creation date
11/23/2007 2:45:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
10/6/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~ <br />_ __- =Golder <br />ASSOClc'~teS <br />October 1, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 3: September 19 through September 25, 2004 <br />Cresson Project Phase II-III Extension Construction Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Ina (Golder) is pleased to submit this summary of Construction Quality Assurance <br />(CQA) services performed for the Modified Amendment No. 7 boundary (Phase IUIII extension) <br />construction at the Cresson Project during the period of September 19 through September 25, 2004. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 29° F to 48° F, and highs ranged from 47° F to 66° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase II-III <br />extension construcfion. Ames conducted Phase II-III extension construction activities on four days of <br />this seven-day reporting period (September 19 through September 22, 2004). Poly-flex conducted <br />Phase II-III extension repairs on one day of this seven day reporting period (September 19, 2004). <br />Phase II-III Extension <br />Ames continued production of Drain Cover Fill (DCF) material at the screen plant by the secondary <br />crusher. <br />Ames commenced and completed hauling, placement and grading of DCF material into the Phase II-III <br />Extension adjacent to the southwest tie-in of Phases II and III. Ames placed DCF material per the <br />project plans onto approved geomembrane panels. <br />A map of the area worked during this reporting period is provided in Attachment C. <br />Phase II-III 3 September 19-September 25, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.