Laserfiche WebLink
<br />The construction schedule for the structures mentioned above predicts <br />completion of construction 1n three years, assuming a construction season of <br />four months each year. Construction will begin with installation of portions <br />of a terrace near the top of West Ridge, followed by construction of all check <br />dams in the drainage channel below West Ridge. After all the check dams are <br />in place, the remainder of the planned terraces will be constructed. <br />Findings of the Colorado Mined Land Reclamation Oivislon <br />Explanation of Findings <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, the Mined Land Reclamation Division or the <br />Board must make specific written findings prior to the issuance of a permit, <br />permit renewal, or permit revision. These findings are based on information <br />made available to the Division that demonstrates that the applicant will be <br />able to operate in compliance with the Colorado Surface Coal Mining Act and <br />the Regulations promulgated pursuant to the Act. <br />This document amends the Findings Document for the Edna Mine dated <br />January 13, 1988. Many sections of that document are not affected by this <br />permit revision. Findings on the following sections of the Regulations <br />have been previously made by the Division, 1n the January 13, 1988 Findings <br />Document and are not affected by the West Ridge hydrologic reconstruction <br />plan: <br />I. Legal, Financial, and Compliance Information - Rule 2.03 <br />II. Land Use - Rules 2.04.3, 2.05.5, and 4.16 <br />III. Cultural and Historic Resources - Rules 2.04.4 and 2.05.6(4) <br />IV. Geology - Rules 2.04.5 and 2.04.6 <br />VI. Ground Water Hydrology - Rules 2.04.5, 2.04.7(1), 2.05.3(4), <br />2.05.6(3), and 4.05 <br />VIII. Water Rights and Replacement - Rules 2.04.7(3), and 4.05.15 <br />X. Climatological Information and Air Resources - Rules 2.04.8, <br />2.05.4(2)(h), 2.05.6(1), and 4.17 <br />XI. Soils - Rules 2.04.9, 2.05.3(5), 2.05.4(2)(d), and 4.06 <br />XII. Vegetation - Rules 2.04.10, 2.05.4(2)(e), and 4.15 <br />XIII. Fish and Wildlife - 2.04.11, 2.05.6(2), and 4.18 <br />XIV. Prime Farmlands - 2.04.12, 2.06.6, and 4.25 <br />XVI. Explosives - 2.05.6(3)(a), and 4.08 <br />XVII. Backfilling and Grading - Rules 2.05.3(6)(b), 2.05.4(2)(a), etc. <br />XVIII. Coal Processing Waste and Non-Coal Waste - Rules 2.05.3(8), <br />2.05.4(2)(f), 4.10 and 4.11 <br />XIX. Mine Facilities, Coal Handling Structures, Support Facilities - <br />Rules 2.05.3(3), 2.05.3(7), and 4.04 <br />XX. Roads - Rules 2.05.3(3)(c) and 4.03 <br />XXII. Sealing of Drilled Holes and Underground Openings - Rules <br />2.05.4(2)(9) and 4.07 <br />XXIII. Subsidence - Rules 2.05.6(6) and 4.20 <br />XXIV. Special Categories other than Alluvial Valley Floors and Prime <br />Farmland - Rules 2.06, 4.22, 4.23, 4.26, 4.27, 4.28, and 4.29 <br />-3- <br />