My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46467
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:17 PM
Creation date
11/23/2007 2:40:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
3/16/1989
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX II <br />STIPULATIONS ATTACHED TO 1986 FINDINGS AND PERMIT <br />Kerr Coal Company <br />Marr Strip; Marr Prep Plant <br />1. KERR COAL IS REQUIRED TO CONSTRUCT ALL DITCHES USING THE DESIGN GRADES <br />RATHER THAN THE GRADES SHDWN ON MAP 16a. IF THIS REQUIRES RELOCATING ANY <br />DITCHES FROM THE LOCATION SHOWN ON THE MaP, THEN A REVISED MAP 16a MUST <br />BE SUBMITTED AT THAT TIME. <br />The requirements of this stipulation are on-going and replaces <br />Stipulation 1 of the 1981 Permit. <br />2. KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS DATA <br />FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE 816-124 OF <br />THE ORIGINAL APPLICATION TO DETERMINE WHETHER FUTURE OPERATIONAL <br />EXPERIENCE IS CONSISTENT WITH THE PROJECTED SWELL FACTOR OF 24%. <br />The requirements of this stipulation are on-going. This stipulation <br />replaces Stipulation 11 of the 1981 permit. <br />3. NO LATER THAN 90 DAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF OPERATIONS <br />ON THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 46) KERR COAL MUST <br />SUBMIT DETAILED WORST CASE RECLAMATION COST ESTIMATES TO THE DIVISION FOR <br />REVIEW. ANY REQUIRED ADDITIONAL BOND AMOUNT MUST BE SUBMITTED AND <br />APPROVED PRIOR TO THE COMMENCEMENT OF OPERATIONS ON THAT INCREMENT. A <br />SIMILAR PROCEDURE SHALL BE FOLLOWED FOR ANY SUBSEQUENT INCREMENTS. <br />This stipulation is on-going, replacing Stipulation 12 of the 1981 permit. <br />R1. THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A YEARLY REPORT ON <br />THE PROGRESS OF ALL HYDROLOGIC MONITORING WHICH INCLUDES ALL DATA <br />COLLECTED FOR THAT YEAR AND A DISCUSSION ON ANY CONCLUSION WHICH CAN BE <br />DRAWN FROM THE DATA. <br />This stipulation is on-going. Annual Hydrology Reports have been <br />received on 2/27/87, 11/6/87 and 11/1/88, for 1986, 1987 and 1988 <br />respectively. <br />R2. KERR COAL COMPANY WILL SUBMIT ALL APPLICABLE MAPS, TABLES, AND TEXT WHICH <br />DESCRIBE THE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS AND <br />RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED DURING THE FORTHCOMING <br />PERMIT TERM. THIS INFORPIATION MUST BE FULLY SUBMITTED WITHIN 90 DAYS OF <br />PERMIT RENEWAL. <br />Kerr Coal Company submitted TR5 on 10/10/85. The Division did not accept <br />the Kerr submittal and it remains outstanding. Kerr plans to submit a <br />revised Mine Plan within the next two months to address these concerns. <br />R3. DUE TO THE RE-CALCULATED VOLUME Or THE TEMPORARY OVERBURDEN STOCKPILE, <br />AND DUE TO THE POSSIBILITY OF NOT OBTAINING THE SUDDUTH LEASE, KERR COAL <br />MUST DEMONSTRATE WITHIN 90 DAYS OF PERMIT RENEWAL THAT APPROXIMATE <br />ORIGINAL CONTOUR CAN BE ACHIEVED. THIS SUBMITTAL MUST INCLUDE ALL <br />APPLICABLE MAPS, TABLES, FIGURES, AND PERTINENT CALCULATIONS TO FULLY <br />DEMONSTRATE THE ACHIEVABILITY OF AOC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.