Laserfiche WebLink
Page 32 <br />Construction 1Vlaterials Rule 1 <br />(a) except as otherwise indicated in this Subsection 1.11.2, <br />the Operator shall provide all the information required by the Act and <br />these Rules for the size of operation. However, the Operator need not <br />supply any information -required by the provisions of the Act which has <br />been previously supplied unless such information is different from that <br />in-the original application. <br />(b) In addition, the application shall show: <br />(i) the azea mined or disturbed; and <br />(ii) the azea reclaimed sirice the original permit <br />application:- <br />tt9 1.12 PERMIT TRANSFERS AND SUCCESSION OF OPERATORS <br />1.12.1 Approval Process <br />(1) Where' one Operator succeeds another at any uncompleted <br />operation, the first Operator shall be released from all liability as to that <br />particular reclamation operation and all applicable Performance and Financial. <br />Warranties as to such operation shall be' released if the successor Operator <br />assumes, as part of the obligation under the Act and these Rules, all liability for <br />the reclamation of the affected land, and the obligation is covered by <br />replacement Performance and Financial Warranties as to such affected land. <br />The successor Operator may be required to post a Financial Warranty of a <br />greater or lesser amount than the existing Financial Warranty dependent upon <br />the actual site reclamation obligation. <br />(2) Requests for permit transfers and succession of Operators must <br />be submitted on "Request for Transfer of Construction Material Permit and <br />Succession of Operators" forms provided by the Boazd. Each request must <br />include an executed Performance Warranty and applicable replacement <br />Financial Warranty. <br />(a) ,The Office shall act on a Succession of Operator <br />application within thirty (30) days. <br />