My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46384
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:19:28 PM
Creation date
11/23/2007 2:36:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
General Documents
Doc Name
Boards Answer to Boyton et al v. MLRB
From
AGO
To
MLRB & DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 31 <br />Construction Materials Rule 1 <br />only change these types of permits by submitting an application to the Office <br />for a new Permit. <br />(3) Applications for.aznendment shall be reviewed by the Boazd or <br />Office in the same manner as applications for new Permits. <br />(4) All aspects of the mining operation and Reclamation Plan that <br />are subject to the amendment will be subject to these Rules, as amended, in <br />effect at the time the Permit is amended. <br />rto~sl 1.11 CONVERSIONS <br />1.11.1 Purposes and Types <br />(1) A conversion is an application to change an existing permit to <br />another type of permit such as changing a Limifed Impact 110 to a Regular <br />Operation 112. <br />(2) Unless such mining is incidental to the permitted activity, any <br />Operator who intends to mine any commodity other than a "construction <br />material" commodity, as defined in Section 34-32.5-103(3), C.R.S., shall apply <br />for a new permit under the provisions of Section 34-32-101, et seg, C.R.S. <br />1984, as amended. Upon issuance of the new permit, the existing permit under <br />Section 34-32.5-101, et seg, C.R.S. 1984, as amended, shall be terminated. <br />Such determinations may be made through declazatory order by the Board. <br />.1.11.2 Application Process <br />(1) An Operator cannot convert a convertible Pemut unless the <br />Operator has held the permit for two consecutive yeazs. <br />(2) All fee, warranty and processing requirements shall apply as <br />though. the Conversion application were a new permit application. A fee, as <br />specified in Section34-32.5-125(1)(a), C.R.S.; as amended, shall be submitted <br />at the time of application submittal. <br />(3) Contents of application: <br />
The URL can be used to link to this page
Your browser does not support the video tag.