My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46384
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:19:28 PM
Creation date
11/23/2007 2:36:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
General Documents
Doc Name
Boards Answer to Boyton et al v. MLRB
From
AGO
To
MLRB & DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16 <br />Construction Materials Rule I <br />(1) Prior to submission of an application for a Special 111 Pemilt, <br />any County Applicant shall apply for and receive a Declazatory Order by the <br />MLRB that it qualifies for a Special 111 Operation Permit. <br />1u(1) (2) .All gerieral application requirements outlined in Subsection <br />u1(2) 1.4.1, and Paragraphs 1.4.2(2) and (4) shall be required for and apply to a <br />Special 111 Operation. <br />111(5) (3) The Office shall approve or deny the application within fifreen <br />(15) calendar days after the date the application is filed. <br />(4) In the event of an objection regarding the approval, denial or <br />modification of a Special 111 Operation.Permit, the provisions of Pazagraph <br />1.4.2(4) shall apply. <br />111(6) (5) A governmental subdivision shall be exempt from an application <br />fee and a Financial Warranty when such subdivision, acting as an Operator, <br />requires a permit solely to extract construction material for the construction of <br />public roads under a contract .with the Department of Transportation or <br />otherwise. <br />1.4.5 Specific Requirements -Regular 112 Operations (see Figure 3) <br />(1) All general application requirements outlined in Subsection <br />1.4.1, shall be required for a Regular Operation. <br />(2) An application will be considered filed for the purpose of <br />calculating the decision-making time periods under Section 34-32.5-,115(1), <br />C.R.S., as amended, when the application file includes all of the following <br />submittals: <br />(a) The application fee, as determined under Section 34- <br />32.5-125 C.R.S., as amended; <br />(b) one (1) original and four (4) copies of: <br />(i) the application form; <br />
The URL can be used to link to this page
Your browser does not support the video tag.