My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46384
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:19:28 PM
Creation date
11/23/2007 2:36:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
General Documents
Doc Name
Boards Answer to Boyton et al v. MLRB
From
AGO
To
MLRB & DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br />Construction Materials Rule 1 <br />115 .. limited to heazings, rule-making proceedings in accordance with the <br />Administrative Procedures Act, Section 24-4-103, C.R.S. 1984,. as <br />amended, and executive sessions. <br />1o3(tz) (26) "Mining" means the extraction of construction materials. <br />103(13) (27) "Minine Operation" means the development or extraction of a <br />construction material from its natural occurrences on affected land. The term <br />includes, but is not limited to, open mining and surface operation and the <br />disposal of refuse from underground and in situ mining. The term includes <br />transportation or processing on affected lands. The term does not iriclude: the <br />exploration and extraction.of natural petroleum in a liquid or gaseous state by <br />means of wells or pipe; the development or extraction of coal; the extraction <br />of geothermal . resources; smelting, refining, . cleaning, prepazation, <br />transportation, and other off-site operations not conducted on affected land. <br />(28) "Modification" means any amendment or revision of any <br />previously granted permit, including permit transfers, increases or decreases <br />of the amount of financial warranty required by the Board, and declazations <br />regazding temporary cessation, which is either: <br />(a) initiated by the Boazd pursuant to Subsection 3.3.2 as <br />necessary to bring the operation into compliance with the provisions of <br />these Rules or the Act, or <br />(b) the subject.of a petition fora formal hearing granted by <br />the Boazd pursuant.to Section 34-32.5-114 of the Act <br />to3(ta) (29) "Office" means the Office of Mined Land Reclamation within <br />the Division of Minerals and Geology (DMG). <br />(30) "Off-site" means an area defined by a proposed or existing <br />construction project, where such project azea does not include the site of <br />construction material extraction nor is it immediately adjacent to such site of <br />extraction. )n relation to an extraction operation, it means that area outside the <br />permit azea. <br />
The URL can be used to link to this page
Your browser does not support the video tag.