Laserfiche WebLink
<br />• <br />MINE LD k OR PROSPECTING ID R <br />INSPECTION DATE 9-5-97 <br />(Page 3) • <br />M-94-117 <br />graduated marker reading = 14 inches <br />added freeboard amount 6 inches <br />Total 20 inches <br />INSPECTOR'S INITIALS GC <br />Problem PB-1 in the 8-21-97 inspection report required the operator to repair a torn area of <br />the pond liner. This area has been patched. The operator needs to submit verification that <br />the hole was repaired using an extrusion welding apparatus and that the repair was vacuum <br />tested. <br />Tailings Poad Spray Evaporation System <br />The spray evaporative system was operating during this inspection. The large spray head was <br />also operating. The recirculating pump for the spray evaporative system has been set into <br />a sump area which has been dug into the tailings in the bottom of the pond. The foot valve <br />intake was measured at 2a.S" below the pond surface and it is set in an open s gallon bucket. <br />This is still an inefficient screen and needs to be improved. The intake must be placed <br />fully enclosed within a screen inside a coarser screen or filter. This has been noted in <br />past inspections and will be discussed during the September Board hearing. <br />It was also observed during this inspection that not all spray heads are flowing at full <br />capacity. The system must be operating efficiently and as approved. Therefore, the operator <br />must submit verification that this system meets the capacity as designed by Richard Fox and <br />approved by the Division. Sae Problem PB-2. <br />Portions of the spray line formerly along the downhill side of the pond are now fully on the <br />liner and the apray directed inside the lined pond. <br />Monitoring Walls <br />The operator has now secured the monitoring well protective covers with locks. <br />Other <br />Scrap pvc has been cleaned out of the diversion ditch near the pond as required in Problem <br />PB-3 of the 8-21-97 inspection report. <br />Use of the designation letter "Y" (Y=Inspected and Found in Compliance) in the GENERAL <br />INSPECTION TOPICS section of page 1 of this report is not intended to abrogate pending <br />problems and possible violations identified in previous reports filed for this site. Use of <br />the letter designation "Y" in this report is intended to indicate that no new problems or <br />possible violations were identified. <br />I & E Contact Address <br /> ~ CE <br />NAME Mr. Curtis Bernhardt ~ BL <br />OPERATOR Colino Oro Molino ~ FS <br />STREET 76 Beaver Street. Suite 500 ~ HW <br />CITY/STATE/ZIP New York. NY 10005 ~ HMWMD (CH) <br /> ~ SE <br />CERTIFIED MAIL NO. P 213 351 959 ~ WQCD (CH) <br />Return Receipt Requested ~ OTHER <br />cc: Carl Mount, DMG <br />Allen Sorenson, DMG <br />Earl Madsen <br />CERTIFIED MAIL NO. P 213 351 960 <br />Return Receipt Requested <br />John Miner <br />CERTIFIED MAIL NO. p 213 351 961 <br />Return Receipt Requested <br />Bob Mason <br />Mark Steen <br />Doug Parker <br />