Laserfiche WebLink
C-81-019 2005 Midterm Review <br />May 5, 2005 <br />Section II -Revisions <br />In addition to the revisions associated with the four permit renewals, there have been one Permit <br />Revision, 59 Technical Revisions, 72 Minor Revisions, and 3 Bond Releases approved on this <br />permit. Revisions to Permit C-1981-019 since the renewal of November 5, 2002 aze summarized <br />in the following table. <br />Revision T e and Number Decision Date Sub'ect Bond Ad'ustment <br /> <br />Technical Revision 56 09/02/2004 Revised postmining + $ 5,060,034.90 <br /> too ah <br />Technical Revision 57 08/21/2002 Revised vegetation <br /> monitorin <br />Technical Revision 58 12/01/2003 Revised minin lan <br />Technical Revision 59 12/14/2004 Sus ension of to soil testin <br /> <br />Minor Revision 60 06/09/2003 Modification to topsoil <br /> stri in schedule <br />Minor Revision 61 01/07/2004 Revision to blasting <br /> documents and monitoring <br /> rocedures <br />Minor Revision 62 04/13/2004 Revisions to topsoil storage + $ 7,918.00 <br /> piles and an added power <br /> line <br />Minor Revision 63 06/21/2004 Revision to a blast record <br /> form <br />Minor Revision 64 07/01/2004 Installation of a water line + $ 845.10 <br /> and power cord from the <br /> facilities azea to a highwall <br /> miner in the West Pit. <br />Minor Revision 65 07/14/2004 Revisions to identify <br /> unleased Federal coal mined <br /> inadvertentl <br />Minor Revision 66 10/21/2004 Relocation of electrical sub- <br /> stationand relocation of rock <br /> crusher <br />Minor Revision 67 11/15/2004 Inclusion of the Taylor Pump <br /> Pond as-built drawin <br />Minor Revision 68 11/26/02004 Di itize Format, Volume 1 <br />Minor Revision 69 2/1/2005 Modification of dust control, <br /> speed limits, hunting <br /> rocedures <br />Minor Revision 70 2/24/05 Ra for rotection <br />Minor Revision 71 incom lete a lication <br />Minor Revision 72 3/18/2005 Bald Ea le si tin <br />