C-81-019 2005 Midterm Review
<br />May 5, 2005
<br />
<br />120 Reseed East Pit Area $577,091 $384,727.00 $379,297 $197,794
<br />121 Reseed East Collection Ditch $5,714 $3,809.00 $3,755 $1,959
<br />122 Reseed South Collection Ditch $15,808 $10,539.00 $10,390 $5,418
<br />123 Reseed South Streeter Ditch $2,190 $1,460.00 $1,440 $750
<br />124 Reseed Streeter Pond $4,000 $2,666.00 $2,629 $1,371
<br />125 Reseed Gulch A Pond $3,809 $2,539.00 $2,504 $1,305
<br />126 Reseed Pros ectPond $2,476 $1,651.00 $1,627 $849
<br />127 Reseed Dra line Walkroad $6,380 $4,254.00 $4,212 $2,168
<br />128 Reseed Mine Maintenance Area $481,861 $321,241.00 $316,707 $165,154
<br />129 Reseed Work Area Pond $3,619 $2,412.00 $2,378 $1,241
<br />130 Reseed Gossard Pond $1,428 $952.00 $939 $489
<br />131 Reseed Gossazd Loo Pond $476 $317.00 $313 $163
<br />132 Reseed StokerSidin Pond $571 $381.00 $376 $195
<br />133 Reseed Wilson Water Pi eline $34,664 $23,109.00 $22,783 $11,881
<br />134 Reseed Section 16 Pit $337,208 $224,805.00 $221,632 $115,576
<br />135 Reseed Section 16 Pond $4,381 $2,920.00 $2,879 $1,502
<br />136 Reseed West Pit $422,819 $281,879.00 $277,901 $144,918
<br />137 Reseed East Ta for Pond $1,619 $1,079.00 $1,064 $555
<br />138 Reseed West Pit Pond $88,659 $59,106.00 $58,272 $30,387
<br />139 Reseed Previousl Bond Released Areas at 50%) $761,963 $761,963.00 $667,195 $94,768
<br />140 S ra 10% of Reseeded Areas for Weeds $50,684 $0 $50,684
<br />141 Reseed Section 16 Pit Last Cut $31,426
<br /> Totals $2,838,846 $2,091,809.00 $1,978,293 $829,127
<br /> A: DMG Costs without 50% Reve Failure
<br />The Division must include costs for reseeding and the standazd reseeding rate is 50%. While this
<br />may seem high, it includes reseeding for vegetation failures, reseeding damaged (rill and gully,
<br />slide, etc.) azeas and all other azeas where vegetation problems arise. The Division also adds a
<br />task for weed spraying (task 140 at a cost of $50,684.00). Overall, the net increase in liability for
<br />the revegetation tasks is $829,127.00.
<br />A sixth discrepancy between the Division and PAP estimates is with the highwall reduction tasks
<br />(Division tasks Ola-003). The costs for reducing a single bench of the East and West Pit
<br />highwalls (cast-blasting) aze basically the same in the Division and PA estimates. A major
<br />difference is that the PAP estimate includes a cost for blasting only ONE bench, as opposed to
<br />the NINE benches in East and West pits. This leads to the total blasting for the East and West
<br />pits being underestimated by azound 90%. Additionally, the PAP estimate does not include a cost
<br />for reducing the Section 16 Pit highwall. They have a task for grading the highwall but it must
<br />first be drilled and shot to break up the material. This omission lead to an increase in liability of
<br />$4,067,584.00.
<br />Task DMG Cost PAP Cost Difference
<br />16
<br />
|