Laserfiche WebLink
C-81-019 2005 Midterm Review <br />May 5, 2005 <br />Item 42 Pages 2.05-35 through 37. The Division does not require a PAP update for approved <br />items accomplished, but Colowyo may want to change the tense of this section for clarity. <br />Item 43 Pages 2.05-38a and 2.05-38d. With the posting of TR-58, the Division copy of the PAP <br />is missing pages 2.05-38b and 2.05-38c. Please provide copies of the missing pages to the <br />Division. <br />Rule 2.05.4(2)(b) <br />Item 44 Pease correct minor discrepancies between Map 22B, Map 38, and those facilities <br />listed for demolition in the cost estimate (Exhibit 13). <br />Item 45 Although discussed in text, no detailed postmining contour map was located during this <br />review for the scoria pit disturbance. Please include, or advise the Division of the location in <br />the PAP, of a postmining contour map of the scoria pit disturbance. <br />Item 46 Map 19. There is a minor discrepancy on Map 19. Please correct the postmining <br />contour through the Section 16 Sedimentation Pond. <br />Rule 2.05.6(3)(b)(ii) <br />Item 47 Page 2.05-591ine 29; page 4.05-15, line 22. The copy of the authorization to discharge <br />under the Colorado Dischazge Pemut System in the PAP (Exhibit 7, Section 2) expired on March <br />31, 2004. It was subsequently extended but has expired, and a new authorization issued. Please <br />replace the expired edition with the current authorization and revise the citation on page <br />4.05-15. <br />Rule 2 <br />Item 48 Pages 2-2 through 2-7. At the end of Rule 2 pages in the PAP is a section under the title <br />Rule 2 Miscellaneous Requirements. The copy of the PAP at the Division does not contain the <br />documents referenced in these pages. Please provide the Division with copies of the <br />documents referenced on pages 2-2 through 2-7 of this section of the PAP. <br />Rule 3.02.2(4) <br />Item 49 Rule 3.02.2(1) states "The amount of the bond shall be sufficient to assure the <br />completion of the reclamation plan if the work had to be performed by the Boazd, through <br />independent contractors, in the event of forfeiture." The Division has accomplished its 2005 mid- <br />term review estimate of the cost to conduct the approved reclamation plan if work had to be <br />performed by the Colorado Mined Land Reclamation Boazd (Board) through independent <br />contractors. This estimate totals a new amount of $33,034,856. A copy of this 2005 mid-term <br />review estimate (Division estimate) is attached as Enclosure 1. The Division estimate is <br />$13,863,235.00 more than the current liability of $19,171,621.00 and $13,534,856.00 more than <br />the current bond held of $19,500,000.00. This item serves as notification to Colowyo of a <br />proposed bond adjustment under the provisions of subpazagraph (a) of this Rule, and the <br />13 <br />