My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - M1983052 (4)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1983052
>
_GENERAL DOCUMENTS - M1983052 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 11:50:56 AM
Creation date
11/23/2007 2:22:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983052
IBM Index Class Name
General Documents
Doc Name
M-1983-052
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> 3 <br /> --------------- --- - <br /> If-- Then- <br /> (1) You stop conducting operations You must follow your approved <br /> for any period of time. interim management plan submitted <br /> under Sec. 3809. 401 (b) (5) ; (ii) <br /> You must submit a modification to <br /> your interim management plan to <br /> BLM within 30 calendar days if it <br /> does not cover the circumstances <br /> of your temporary closure per Sec. <br /> 3809.431 (a) ; (iii) You must take <br /> all necessary actions to assure <br /> that unnecessary or undue <br /> degradation does not occur; and <br /> (iv) You must maintain an adequate <br /> financial guarantee. <br /> ------------------------------------------------------------------------ <br /> (2) The period of non-operation is The BLM will require you to take <br /> likely to cause unnecessary or all necessary actions to assure <br /> undue degradation. that unnecessary or undue <br /> degradation does not occur, <br /> including requiring you, after an <br /> extended period of non-operation <br /> for other than seasonal <br /> operations, to remove all <br /> structures, equipment, and other <br /> facilities and reclaim the project <br /> area. <br /> ------------------------ ------- <br /> (3) Your operations are inactive BLM will review your operations and <br /> for 5 consecutive years. determine whether BLM should <br /> terminate your plan of operations <br /> and direct final reclamation and <br /> closure. <br /> ------------------------------------------------------------------------ <br /> (4 ) BLM determines that you BLM may initiate forfeiture under <br /> abandoned your operations. Sec. 3B09. 595. I£ the amount of <br /> the financial guarantee is <br /> inadequate to cover the costs of <br /> reclamation, BLM may complete the <br /> reclamation, and the operator and <br /> all other responsible persons are <br /> liable for the costs of such <br /> reclamation. See Sec. 3809. 336 (a) <br /> for indicators of abandonment. <br /> ------------------------------------------------------------------------ <br /> (b) Your reclamation and closure obligations continue until satisfied. <br /> Sec. 3809. 600 With what frequency will BLM inspect my operations? <br /> (a) At any time, BLM may inspect your operations, including all <br /> structures, equipment, workings, and uses located on the public lands. <br /> The inspection may include verification that your operations comply with <br /> this subpart . See Sec. 3715.7 of this title for special provisions <br /> governing inspection of the inside of structures used solely for <br /> residential purposes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.