Laserfiche WebLink
into new Exhibit 22-1 "Postmining Vegetation". Exhibits 20-1 and 20-1A "Disturbed Area" <br />maps were removed from the permit, and the disturbance boundaries were depicted on other <br />appropriate operations and reclamation plan map exhibits. Anew permit volume "8A" was <br />provided to accommodate additional materials incorporated within permit Tab 13. <br />Technical Revisions <br />TR-45 proposed approval decision was issued November 5, 2004. The revision provided <br />information regarding temporary and permanent roads in response to permit stipulations 31, 32, and <br />33 (which had been attached to TR~2. The revision also modified postmine topography in <br />portions of the "A" Pit and "B" Pit areas, and revised permanent drainage channel designs in the <br />016 watershed. <br />TR~6 proposed approval decision was issued January 20, 2004. The revision extended backfilling <br />and grading timeframes for "B" Pit until 3/31/04 and Ridgeline "A" Pit until 12/31/04. <br />TR~7 proposed approval decision was issued February 19, 2004. The revision modified certain <br />aspects of the Aspen Study Plan, including schedule of work and plot layout. The revision was <br />submitted to abate Notice of Violation (NOV) CV-2003-015. <br />TR~8 proposed approval decision was issued August 20, 2004. The revision provided certified <br />"As-Built" reports for Haul Road "K", Pond O16A, and Pond 006 Phase V. <br />TR~9 proposed approval decision was issued May 5, 2005. The revision modified design plans <br />for the north portion of the Ridgeline Access Road, provided a remediation plan for a slump in the <br />"A' Pit reclaimed highwall, and provided a storage capacity survey for Sedimentation Pond 016A. <br />TR-50 proposed approval decision was issued December 12, 2005. The revision was in response <br />to the Division's mid-term permit review, and provided modifications to various aspects of the <br />approved mining and reclamation plan. Amendments included clarifications and/or changes to: <br />• Spoil sampling and mitigation plan <br />• Permanent road and pond retention plans <br />• Annual impoundment certifications <br />• Reclamation scheduling <br />• South Extension permanent channel designs <br />• Aspen planting approaches <br />• Shrub establishment area specifics <br />• Vegetation cover and species diversity success evaluation <br />• Annual revegetation monitoring plan <br />Seneca II-W Findings Document 8 luty 3, 2006 <br />Permit Renewal No. 5 <br />