My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-08_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2006-11-08_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:14:57 PM
Creation date
11/23/2007 2:15:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
11/8/2006
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Revisions since Renewal No. 4 (May 2004) <br />Revision Number Descri tion Date A roved <br />MR-86 On-site Debris Dis osal Nov 2005 <br />Bond Releases since Renewal No. 4 Ma 2004 <br />Bond Release Description Date Approved Post-approval liability <br />SL-02 Phase I Bond Pending Pending <br /> Release <br />Section III <br />Status of Stipulations <br />There are no active stipulations for the New Elk mine permit at this time. All stipulations <br />have been previously resolved. <br />Section IV <br />Enforcement Actions <br />This section is a review of the enforcement actions issued since the last permit renewal <br />(RN-04) in May 2004. The mine received one violation in August 2006 and a related <br />cessation order in October 2006. <br />NOV CV-2006-003 <br />This violation was issued for failure to submit additional bond as required by Surety <br />Increase No. 1 (SI-01). The Division reviewed and recalculated the reclamation cost <br />estimate and determined the required amount of bond to be held by the Division to be <br />$3,579,533.00. As required, the Division notified Picketwire Processing, LLC. in a letter <br />dated March 31, 2005, that the current corporate surety from Lyndon Property and <br />Insurance in the amount of $2,114,649.00 held by the Division was insufficient and <br />additional bond was required. The letter also advised the permittee of their right to an <br />informal conference. An informal conference was requested and held on May 19, 2005. <br />The permittee's representative discussed permitting options that would be submitted to <br />the Division for review and approval to allow a reduction in the reclamation cost <br />estimate based on on-site material disposal and permitting of permanent structures at <br />the site. A second letter advising Picketwire Processing, LLC of the surety increase <br />was sent on December 20, 2005. The decision to adjust the reclamation bond amount <br />was published and subsequently became final on January 28, 2006. Since that time, <br />7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.