My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-09_GENERAL DOCUMENTS - C1981038
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2004-04-09_GENERAL DOCUMENTS - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 5:10:24 PM
Creation date
11/23/2007 2:07:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
4/9/2004
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Partial Phase I
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS OF THE <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />PARTIAL PHASE ONE BOND RELEASE <br />The process of releasing the reclamation liability bond for a mine site is explained in Rule 3.03 and <br />further described in the Division's 1995 Guideline Regarding Selected Coal Mining Bond Release Issues. <br />The bond release process involves three phases. At Phase One, up to sixty percent of the total reclamation <br />bond can be released for successful completion of backfilling, grading and drainage control as required by <br />the approved plan. At Phase Two, up to 85 percent of the total reclamation bond can be released for <br />successful establishment of vegetation as required in the approved plan. At Phase Three, the remaining <br />reclamation bond can be released upon completion of all of the reclamation work, but not before a period <br />often years has passed after the last augmented seeding, fertilizing, irrigation or other work. <br />There are additional considerations in the bond release process. One consideration is that no more than <br />sixty percent of the reclamation bond can be released if the suspended solids level from the reclaimed <br />area is greater than that of pre-mining levels or from adjacent, undisturbed areas. Another consideration is <br />that the Division can not release any reclamation bond that would result in insufficient funds to finish the <br />remaining reclamation work. <br />The operator must submit a formal request to the Division for each reclamation bond release phase. The <br />specific items that need to be addressed in the submittal are listed in the 1995 Guideline Regarding <br />Selected Coal Mining Bond Release Issues. Notification of the bond release request is made with the <br />publication of a public notice and by notification letters sent to adjoining landowners, surface owners and <br />various local government agencies. <br />When the Division calls the submittal complete, a field inspection and evaluation is conducted to <br />determine the status of the reclamation work that was performed. The field inspection and evaluation are <br />to be held within Yhirty days of completeness or as soon as weather permits thereafter. The evaluation also <br />must take into effect the results of past monthly inspections, surface and ground water monitoring data <br />and whether pollution of surface or subsurface water is occurcing, the probability of such future pollution <br />and the estimated cost to abate pollution, the stability of the reclaimed surface lands and the degree of <br />difficulty and estimated cost to complete any remaining reclamation. <br />The inspection and evaluation report is to be made available to the public at the Division's offices. <br />Objections to the bond release may be made within thirty days of the submittal completeness date or <br />within thirty days of the completed field inspection. <br />After this initial process has been completed, the Division makes its proposed decision. The proposed <br />decision is made by the Division as to whether to release or not release all or a portion of the reclamation <br />bond. Written notification of the proposed decision is sent to the permittee, the surety company and <br />interested parties. The written notification details in a findings document the reasons for the proposed <br />decision, provides recommendations for any additional work needed to complete the bond release and <br />informs the parties of their right to appeal the proposed decision. The Division also publishes the <br />proposed decision in a public notice. <br />The following is a detailed evaluation of the work performed for the partial Phase One Bond Release at <br />the Bowie No. 1 Mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.