Laserfiche WebLink
TR-31 -Incorporate Revised Air Emissions Permits Into The Permit <br />-submitted 04/16/99 <br />-withdrawn 09/03/99 <br />TR-32 -Increase Loadout Production <br />-submitted 09/07/99 <br />-approved 02/08/00 <br />-no bond adjustment <br />-no acreage adjustment <br />TR-33 -Widen Train Loadout Haul Road <br />-submitted 07/02/00 <br />-approved 08/30/00 <br />-bond increased by $14,562.00 <br />-disturbed acreage increased by 0.1 acres <br />TR-34 -Hydrologic Monitoring Reduction <br />-submitted 07/26/00 <br />-review is ongoing <br />Permit Revisions <br />There were no permit revisions submitted since the Permit Renewal No. 3 issue date of April 20, 1998. <br />Succession of Operator <br />SO-03 - Transfer of Permit From Bowie Resources Limited to Vulcan Coal Company of Colorado <br />- submitted !0/10/00 <br />- review is ongoing <br />Stipulations <br />The following are the stipulations that are still active. Stipulations Nos. 53 and 54 were generated <br />specifically for Permit Renewal No. 3. The other stipulations came from previous permitting actions. <br />All other stipulations have been complied with or have been terminated. <br />Stipulation No. 26 <br />One yeaz after the completion of reclamation activities at the loadout, the operator shall compare <br />the soil characteristics of the reclaimed area with the adjacent undisturbed orchard azeas to verify <br />that the hydrologic function of flood irrigability has been restored. Such comparison should be in <br />the form of infiltration, permeability and texture studies. <br />