Laserfiche WebLink
-z- <br />Stipulation No. 4 <br />THE OPERATOR SHALL SUBMIT A PLAN TO THE DIVISION TO CONTROL THE EROSIVE <br />VELOCITIES OF ALL DRAINAGE DITCHES WITHIN THE FEDERAL LEASE PERMIT <br />REVISION AREA WITH DESIGN VELOCITIES IN EXCESS OF 5 FEET PER SECOND <br />WITHIN 90 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 5 <br />THE SURFACE WATER MONITORING PROGRAM 'WILL INCLUDE THE FOLLOWING <br />MONITORING FREQUEiCY AND ALL WATER ANALYSES WILL BE PERFORMED USING THE <br />PARAMETERS LISTED BELOW: <br />MONITORING SITE <br />DESIGNATION <br />Sl <br />52 <br />S3 <br />FLOW MEASUREMENT <br />FREQUENCY <br />MONTHLY <br />MONTHLY <br />MONTHLY <br />REQUIRED PARAMETERS <br />pH (FIELD) <br />CONDUCTIVITY AT 25oc (FIELD) <br />TOTAL DISSOLVED SOLIDS <br />TOTAL SUSPENDED SOLIDS <br />OIL AND GREASE <br />SODIU61 ABSORPTION RATIO <br />BICARBONATE <br />CALCIUt4 <br />MAGNESIUM <br />NITRATE <br />SODIUM <br />WATER SAMPLING <br />FREQUENCY <br />QUARTERLY <br />QUARTERLY <br />QUARTERLY <br />SULFATE <br />ALU:AINUM <br />ARSENIC <br />CADMIUM <br />IRUiV <br />LEAD <br />MANGANESE <br />MERCURY <br />MOLYBDEiJUM <br />SELENIUM <br />ZI t1C <br />RESULTS OF THE MONITORING PROGRAM MUST BE SUBMITTED TO THE DIVISION <br />SEMI-ANNUALLY. <br />Stipulation No. 6 <br />DURING RECLAMATION OPERATIONS, THE OPERATOR MUST SALVAGE AND REPLACE ALL <br />AVAILABLE TOPSOIL. IF AT LEAST SIX INCHES OF hWTERIAL IS NOT AVAILABLE <br />FOR REPLACEMENT, THE APPLICANT MUST OBTAIN ENOUGH ADDITIONAL SUITABLE <br />SOIL MATERIAL FOR REVEGETATION PURPOSES TO PROVIDE A TOPSOIL DEPTH OF AT <br />LEAST SIX INCHES ON ALL DISTURBED AREAS OF THE FEDERAL LEASE MINE PERMIT <br />AREA. <br />Stipulation Yo. 7 <br />THE APPLICANT RUST PROVIDE FOR ADEQUATE STABILIZATION OF THE STEEPER <br />SLOPES DURING THE FIRST YEAR OF RECLAt+WTION. THE PLAN MUST BE APPROVED <br />BY THE DIVISION WITHIN 90 DAYS AFTER THE FIRST SURFACE DISTURBANCE <br />'WITHIN THE FEDERAL LEASE AREA. <br />