My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45722
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:15:54 PM
Creation date
11/23/2007 2:03:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
1/25/1984
Doc Name
MINING PERMIT (Dated January 16, 1984 to January 16, 1989)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />List of Stipulations <br />Stipulation No. 1 <br />THE PER MITTEE OF THE COLORADO COAL MINE N0. 1 IdUST SUBMIT TO THE <br />DIVISION A PERFORMANCE BOND IN THE TOTAL N~IUUNT OF 5345,260.00 FOR THE <br />COLORADO COAL MINE N0. 1 WITHIN THE 30-DAY PUBLIC COMMENT PERIOD FOR <br />THIS PROPOSED DECISION. THIS BOND MUST SATISFY ALL APPLICABLE <br />REQUIREMENTS OF RULE 3. IF THIS BOND IS NOT SUBMITTED IN THE SPECIFIED <br />TIME PERIOD AND IN ACCORDANCE WITH THE REQUIREMENTS OF RULE 3, THE <br />DIVISION'S FINDING CONCERNING RULE 2.07.6(2)(9) SHALL BE COtJSIDERED i4ULL <br />AND VOID AND THE DIVISION WILL 1407 BE ABLE TO I+IP,KE THE FINDINGS REQUIRED <br />TO ISSUE A PERMIT FOR THE CHIMNEY ROCK COAL MINE. <br />Stipulation No. 2 <br />THE GROUND WATER MONITORING PROGRAfA WILL INCLUDE THE FOLLOWING <br />MONITORING FREQUENCY AND ALL WATER ANALYSES WILL BE PERFORMED USING THE <br />PARAMETERS LISTED BELOW: <br />WELL WATER LEVEL WATER SAt4PLING <br />DESIGNATION CHECK FREQUENCY FREQUENCY <br />Wl MONTHLY QUARTERLY <br />W5 MONTHLY QUARTERLY <br />W6 MONTHLY QUARTERLY <br />W7 MONTHLY QUARTERLY <br />W9 MONTHLY QUARTERLY <br />'W 10 MONTHLY QUARTERLY <br />SPOIL AQUIFER 'WELL tdONTHLY QUARTERLY <br />REQUIRED PARAMETERS <br />pH (FIELD) CALCIUM SULFATE LEAD <br />CONDUCTIVITY AT 25oC (FIELD) MAGNESIUM ALUMINUM h1Af4GANESE <br />TEh1PERATURE (FIELD) PMMONIA ARSENIC MERCURY <br />TOT,4L DISSOLVED SOLIDS NITRATE CADh1IUM SELENIUM <br />BICARBONATE SODIUM IRON ZINC <br />CHIh1NEY ROCK COAL MUST SUBMIT THE RESULTS OF THE ABOVE MONITORING <br />PROGRAM TO THE DIVISION SEMI-ANtJUALLY. <br />Stipulation No. 3 <br />WITHIN 120 DAYS OF ISSUANCE OF THE PERMIT REVISION, THE OPERATOR SHALL <br />DESIGN AND CONSTRUCT A MECHANISM FOR DE'o-IATERING THE SEDIMENTATION <br />FACILITIES 'WHICH WILL MEET THE REQUIREMENTS OF THE DIVISI014`S <br />REGULATIONS. SUCH DESIGNS SHALL BE FOR:JARDED TO At4D A?PROVED BY THE <br />DIVISION PRIOR TO COI•ISTRUCTIOrl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.