Laserfiche WebLink
~. <br />3 <br />7/18/96 694-O15 Pailure to conduct opcretions in Vacated <br /> permit; failure to plan aad conduct <br /> mining activities to minimize <br /> disturbance to the hydrologic balancc, <br /> failure to dcaign pond to providc <br /> adequate capadty <br />12/2/96 694-037 Failure [o pmvidc cufficicnt 12/29/94 Submit Revision <br /> information regarding Wrst Pit <br /> mining area udimcnt control <br /> praaicea to demonstrate adequatc <br /> rapacity to contain the 10.ycar, 24 <br /> hour evcnt. <br />3/29/95 G95-0RS Pailurt to placc topsoil on atablc Pcnding Monitor slid<, move <br /> area; Failure to havc ctablc pond topsoil R rtpair pond <br /> perimeter slope <br />Section III- History of Revisions <br />Subsequent to permit renewal on November 5, 1992, Colowyo has submitted and obtained <br />approval for 9 minor revisions and 11 technical revisions. <br />DATE APPROVED REVISION NUMBER DESCRIPTION OF REVISION CI L4NGH TO BOND <br /> LL4BIL17Y <br />11/4/92 MR-21 Topsoil rcmoval for dragline rslocalion +5,069 <br />1/27/93 MR-22 Blasting Rcpons 0 <br />12/24/92 MR-23 Upper Goodspring Creek Monitoring 0 <br />1/26/93 MR-7A Caal Stockpile Expansion 0 <br />8/17/93 MR-25 Swell Factor Analysis 0 <br />2/18/91 MR-26 Opcrator Name Change; Inlcrnal <br />Reorganva[ion 0 <br />4/10/94 MR-27 Development Drilling 0 <br />1/4/95 MR-28 Sediment Control Mcasurts 0 <br />3/10/95 MR-29 Update Ownership and Control 0 <br />6/4/93 TR-21 Auger Mining 0 <br />9/23/93 TR-22 Post Mining Contours Modification 0 <br />9/20/93 TR-23 Interim Topography, Sution 15/16 <br />9/14/93 TR-24 Bond Modifintion; Ponds; Topsoil Stockpilc +113,980 <br />1/14/94 TR-25 War Pit Pond 0 <br />3/18/94 TR-26 Rcduction o[ Monitoring Requirements 0 <br />12/6/94 TR-27 Addition of Nrn Gcncral Partner 0 <br />5/20/94 TR-28 Topsoil Stockpiles; Dcsclopment Drilling +14,915 <br />