Laserfiche WebLink
ACOUSTIC CEMENT BOND LOGGING <br />CHECK LISTS <br />INFORMATION REQUESTED PRIOR TO RUNNING CEMENT EVALUATION LOGS <br />I. CEMENT DATA. <br />A. Types, volumes, slurry weights, pumping rate. <br />B. Estimated compressive strength. <br />C. Date and time cementing opf:ration was completed. <br />D. Additives. <br />E. A copy of Cementing Report: would be helpful. <br />II. ASSOCIATED CEMENTING PROBLEMS. <br />A. Lost circulation? <br />B. Unable to reciprocate? Stuclc pipe? <br />C. Abnormal pressures held after plug down? How long? <br />III. CASING INFORMATION. <br />A. All strings --- size, weight, grade, coupling (flush Joint?) <br />B. Top bottom depths --- overiz~ps? Annulaz thiclmess? <br />C. Cementing aids ---scratchers, centralizers, hydrobonders -where? <br />IV. WELL INFORMATION. <br />A. Straight hole or deviated? If' deviated, at what depth? Degree? <br />B. Bit size? <br />C. Wellbore fluid? Accurate df:nsit}~? Same as plug down fluid? <br />D. Casing problems? Liner not set? Potential for gas cut fluid? <br />11 <br />