My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45492
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:53 PM
Creation date
11/23/2007 1:53:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
3/1/2002
Doc Name
Draft Permit
From
EPA
To
American Soda LLP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
receiver is adjusted for a maximum output of 80mv. <br />B. Signal output of Sft receiver is adjusted in order to compensate for energy <br />loss related to the 3ft., due to the extended travel time of 114 microseconds. <br />C. Panels aze calibrated for response and linearity . <br />D. A full display of calibration is recorded for every tool. Shop calibrations <br />aze required monthly or more frequently as needed. A copy of the shop <br />calibration should be attached to the log. <br />Well Site Calibration <br />A. With tool in hole and in fluid, panel output is calibrated for a lineaz output <br />relation of 100mv. for 10 chart divisions.-10 my/div. This calibration is <br />done in order to scale the amplitude values. <br />B. Secondary amplitude X4 or XS is calibrated. <br />C. Internal calibration cycle of 35mv amplitude and 50 microseconds <br />wavelength is activated; The gate is set on the cycle, and amplitude <br />deflection is adjusted according to previous 0-100mv settings. <br />D. Calibration cycle is deactivated. Tool signal on 3 foot receiver is present; <br />the gate is set on the first compressional cycle, and amplitude reading is <br />verified. <br />IV. Complete Log Heading. <br />V. Run V DL, MSG, Signature, X-V plot on 200-1200 microsecond time scale. <br />VI. Run repeat sections (200' minimum) through intervals of interest or intervals with <br />questionable bond. <br />VII. Logging speed should be 1800 feetlbr. <br />VII, If tool is improperly centralized, do not continue to log. Pullout of hole and adjust or <br />replace centralizers. <br />IX. Upon completion of logging run, check surface calibration. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.