Laserfiche WebLink
-3- <br />Stipulation No. 4 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE (MUST PROVIDE <br />THE DIVISION WITH AN ACCEPTABLE SUCCESS CRITERIA STANDARD FOR SHRUB <br />DENSITY AT THE MINE SITE. <br />Stipulation No. 5 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH AN ACCEPTABLE SPECIES UIVERSITY SUCCESS STANDARD <br />FOR THE REVEGETHTED AREAS OF THE MINE. <br />Stipulation No. 6 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE IhUST PROVIDE <br />THE DIVISION WITH ACCEPTABLE SUCCESS STANDARDS FOR COVEk AND <br />PRODUCTIVITY FOR THE AREAS TO BE RECLAIMED AT THE LOADOUT <br />FACILITY. ALSO, SPECIES DIVERSITY AND WOODY PLANT DENSITY <br />STANDARDS MUST BE PROVIDED FOR THE TRUCK DUMP - DRYLAND GRASSLAND <br />AREA. <br />Stipulation No. 7 <br />SNUWMASS COAL COMPANY SHALL CONSTRUCT ALL ADDITIUNNL POWERPOLES AND <br />LINES AT NORTH THOMPSON CREEK MINE AND LOADOUT SO AS TO MIN LMIZE <br />THE DANGER OF ELECTROCUTION TO RAPTORS. THE UESIGiVS SHALL BE <br />SUBMITTED TO AND BE APPROVED BY THE DIVISION PRIOR TU CONSTRUCTION. <br />Stipulation No. B <br />THE OPEKATUR SHNLL RESTORE THNT PORTION OF THE LOAODUT HAUL ROAD <br />WHICH DISTURBED PRIME FARMLANDS TO ITS PRE-MINING LAND USE OF <br />HGRICULTURE IN ACCORDANCE WITH RULES 2. U6.6, 4.25, HND THE PLAN <br />CONTAINED IN 7HE APPROVED PERMIT APPLICATION. <br />Stipulation No. 9 <br />THE DIVISION DIRECTS SNUWMASS COAL COMPANY TO INSTALL SU85IOENCE <br />MONUMENTATION, AS DESCRIBED 'WITHIN EXHIBIT 4-H OF THE PERMIT <br />NPPLICATION, ABOVE ANY UNDERGROUND WORKINGS INSTALLED WITHIN THE <br />LIMITED EXTRACTION AREAS INDICATED ON MAPS A AND B OF EXHIBIT 4-H. <br />SURFACE SUBSIDENCE MONUMENTS SHALL BE INSTALLED AND SURVEYED AT <br />LENST UNE MONTH PRIOR TO UNDERMINING. <br />