My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45390
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:36 PM
Creation date
11/23/2007 1:46:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
7/8/1983
Doc Name
Proposed Decision and Findings of Compliance
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />PROPOSED DECISION <br />Snowmass Coal Company - North Thompson Creek Mines <br />The Colorado Mined Land Reclamation Division proposes to approve, with <br />stipulations, an application for a permit to conduct coal mining <br />operations submitted by Snowmass Coal Company for the North Thompson <br />Creek Mines. <br />This decision is based on a finding that the proposed operation will <br />comply with the requirements of the Colorado Surface Coal Mining <br />Reclamation Hct, C.R.S. 1973, as amended, 34-33-101 et sew., and the <br />Regulations promulgated pursuant to the Act. <br />The permit application and the stipulations will become a binding part of <br />the permit upon approval. The stipulations for the North Thompson Creek <br />Mines are as follows: <br />Stipulation No. 1 <br />WITHIN ONE HUNDRED AND TWEiVTY (120) DAYS OF PERMIT ISSUANCE, <br />SNOWMASS CURL COMPANY SHALL INSTALL ADDITIONAL MONITORING WELLS TO <br />MONITOR THE UPPER SANDSTONE OF THE WILLIAMS FORK FORMATION. THESE <br />MONITORING WELLS MAY BE DRILLED WITHIN THE N0. 3 MINE TO REDUCE <br />DRILLING COSTS. ALL MOIVITURING WELLS SHALL BE: 1) PROPERLY <br />SCREENED WITHIN THE ENTIRE SANDSTONE UNIT, AND 2) PROPERLY SEALED <br />AT THE TOP AND BOTTOM TO PREVENT THEIR DESTRUCTION. THE SPACING OF <br />THE ADDITIONAL MONITORING WELLS SHALL BE SUBMITTED TO THE DIVISON <br />FOR NPPROVAL 6U DAYS FOLLOWING ISSUANCE OF THIS PERMIT. <br />Stipulation No. 2 <br />ALL CULLUVIAL MATERIAL AT THE RUFUSE PILE USED AS TOPSOIL OR <br />NON-TOXIC, NON-COMBUSTIBLE COVER FOR THE REFUSE PILE MUST BE <br />ANHLYZEU NNU APPROVED BY THE DIVISION AS MEETING THE ESTABLISHED <br />CRITERIA FOR SUITABILITY FOR TOPSOIL AND/OR SUBSOIL. <br />Stipulation No. 3 <br />WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />THE DIVISION WITH A COMPREHENSIVE TREE AND SHRUB PLANTING PLAN. <br />THE PLAN MUST INCLWE A LIST OF SPECIES TD BE PLNNTEU, NUMBERS OF <br />EACH SPECIES PER ACRE AND ACRES TO BE PLANTED. THE PLANTING PLAN <br />MUST ALSO DESCRIBE THE PHTTERN TU dE UTILIZED IN PLANTING THE PLHiVT <br />MATERIALS, THE SEASON DF THE YEAR OF PLANTING AND ALL LOCATIONS <br />WHICH WILL dE PLANTED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.