My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45369
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:32 PM
Creation date
11/23/2007 1:45:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
5/13/2002
Doc Name
MSHA TEST SITE DOCUMENTATION-1980
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be made in the roof. <br />n <br />U <br />(c) The concrete blocks will be laid in mortar in a transverse <br />pattern. In the bottom row or Row ~1, the concrete blocks <br />are set parallel to the ribs, while in the next row, or Row <br />~2, the long faces of the blocks are perpendicular to the <br />ribs. This same alternating placement is repeated. Vertical <br />mortar joints shall be offset. The materials of construction <br />shall be packed tightly against the roof and ribs, the full <br />length of the bulkhead. <br />(d) An interlaced pilaster shall be constructed in the center of <br />the bulkhead wfien the bulkhead exceeds a width of 16 feet or <br />a height of 10 feet, exclusive of recesses. <br /> <br />(e) A sealant coating, acceptable by MSHA and listed in Part K of <br />this plan, shall be applied to the accessible face and perimeter <br />of the seal to effectively limit the gas-air exchange through the <br />bulkhead. The sealant will be equivalent to a 0.25 inch coating <br />of wood fiber and mortar. <br />(f) A surveillance tube shall be installed in the bulkheads whereby <br />a seal area can be readily sampled for gas. The surveillance <br />tube shall be 0.25 in. copper tubing, a 0.5 inch I.D., Schedule <br />40 pipe or equivalent and shall be sealed at the accessible <br />outlet with a valve. (Tube and fittings shall withstand a mini- <br />mum pressure of 75 psig). <br /> <br />(g) 1Jhere necessary, pipe(s) for water drainage shall be incorporated <br />and located at the lowest elevation of the bulkhead. The pipes <br />are to be corrosion resistant and equal in strength to Schedule <br />40 steel pipe. Multiple pipes will be used where high volumes <br />of water are encountered. <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.