Laserfiche WebLink
<br />On September 16, 1996, a Phase II bond release was submitted to reduce the eaasting bond <br />to $37,500.00. The application was deemed complete upon receipt of the proof of <br />publication of public notice on September 26, 1996. The Division scheduled and conducted <br />a bond release inspection on October 23, 1996. The request was subsequently approved on <br />November 27, 1996. <br />Section II-History of Violations <br />A review of the inspection and enforcement activities during the first half of the permit term <br />was conducted. No enforcement actions have been taken by the Division since the last <br />renewal. <br />Section III-History of Revisions to the Permit <br />Since the last permit renewal (RN-02) on March 14, 1994, the Division has approved the <br />following revisions: <br />DATE APPROVED REVISION NUMBER DESCRIP'17ON OF REVISION C7L\NGE TO BOND <br /> LL4BILrCY <br />08/22/94 TR-13 Rcviscd Revegetation Rrquirementa 0 <br />10/14/94 MR115 Qunge in Address 0 <br />10/21/94 MR-06 Gta7iog Plan <br />03/07/95 MR-07 NPDPS Petmit Update 0 <br />Ol/7A/96 MR-0B Qunge is Operator Name 0 <br />Section IV- Status of Stipulations <br />Stipulation 7, Pest Control Plan, is an active stipulation. All other stipulations from the <br />original permit have been complied with. <br />Section V -Decision to Require Revisions <br />As a result of this midterm review, the Division will require revision(s) of the permit to <br />address the following concerns with the currently approved CCMC No.l permit application. <br />1. On page 1.01-1 of the permit, please update the introduction to include <br />narrative describing the reorganization of Kaiser Resources to Kaiser <br />Ventures Inc. <br />