My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44935
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:38 PM
Creation date
11/23/2007 1:25:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Name
2.06.10
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~~~d by ~~.~ Alelse„ ~~9~ <br />6.3 QO~L PFD(_'FSSING PLAfS AbID <br /> <br />FS NOT LOCATID WITHIN <br />Trinidad Basin Mining uses anoff-site loadout facility for crushing, <br />storing (temporary) and loading of the coal into railroad cars. The <br />loadout is located in Trinidad on property named by the AT&SF Fai.lway <br />Canpany. The authariution for this use has been presented in f~chibit <br />III-2, said exhibit also furnishes the location of the loadout. <br />The loadout facility is located adjacent to the AT&SF tracks and <br />zs <br />is oo~rised of appn-+Y~++~tely~5 acres. The physical layout of the <br />facility has been shown on Map V-3. As can be seen on the map, the area <br />is alrrost flat and all disturbed lands are serviced by the various <br />oa[q~onents of the sediment control system. It should be noted that <br />no processing plants are located at the site. <br />Tt1e operation of the facility is very basic >n that coal is hauled <br />to the site for crushing and loading into railway cars. There is no <br />cleaning or washing of coal at the site. The coal is crushed per the <br />size recd ».~mmnts of TBM's custuners, loaded into the cars arri shipped. <br />'lY~e reclamation of the site will entail rerroving of all structures <br />c~stnrcted by TBM and removal of the opal used as pads. The structures <br />to be raroved as as follows: r-.„char, truck ramp, office and sediment <br />control system. The coal used in the pads will be rertrn~ed and hauled <br />to the mine for burial in the last cut. By conq~leting these activities <br />the site will be left in a condition which is attractive to another <br />irrlustrial user and consistent with the surface owner's requirements. <br />~e rec~,;*~~rrts of Rile 4.28 are not applicable to the loadout <br />aryl TEM has furnished sufficient informati~ to demonstrate oo~lianoe <br />with the other recd,; ramnts of Rile 4 for the loadout. <br />VI-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.