My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44706
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:26 PM
Creation date
11/23/2007 1:15:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988048
IBM Index Class Name
General Documents
Doc Name
APPLICATION FOR USE BY SPECIAL REVIEW PERMIT IN WELD CNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />1 <br />1 <br /> <br />1 <br /> <br /> <br />t <br />III <br />L~ <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br />Table [:i-1 <br />L'~?nsltfn Ot ive Water- Use <br />Descr t. pt. i.un_..______. _ __ _. <br />Stockpile Moisture Loss <br />Dust fiuppr•ession <br />Concrete Patching (temporary) <br />gsphait Batchino (tenrpur•aryY <br />ConsuntpC ion.<af/yr ). <br />Total Pusslble Wat er• Consumption <br />1.5 <br />2.~ <br />0. 'c' <br />a. i. <br />.°,. Ei <br />S~~ur•ces ~~f water to supply these needs will c.~mes fr•um existing <br />wells and sur•Pace water r•iphts in the area. The applicant i~~ <br />currently leasing available supplies and will submit a copy of <br />the water- lease to the KLRD when it has been obtaineC, <br />Direct discharge to Lone Tree Creek fram wash waters will n~~t be <br />done. qll waters used in washing and batch inq_ oper•at ions will be <br />recycled through holding ponds. Ther•efor•e, an NPDES permit is <br />not necessary for- this operation. Point source dischar•pe of <br />stor•nr waters draining from the site ar•e not exoected t~~ be an <br />impact. Et•osion control measures as mentioned will reduce the <br />amount of sediment discharging to the stream. The pr•aposed <br />phased reclamation plan will also minimize the amount oY" <br />disturbed pr•ottnd which in turn will reduce sediment. £r•osion <br />control of stockpiles will be handled by r•eplacinq this material <br />and reclaiming immediately after- the aggregates have been <br />e•emuved. <br />G - 'c' <br />
The URL can be used to link to this page
Your browser does not support the video tag.