Laserfiche WebLink
i~ <br />~~ <br />14. Should the iJrban Draimge and Flood Controt District recommend lakeside spillway(s) construction, <br />the operator shall present the fmal design of the spillway structure(s) for approval by the District and <br />Adams Couaty and shall construct the spiItway(s}. <br />20. All conditions precedent must be satisf~rt prior to commencing operations on the subject site. Proof <br />that the concerns have been addressed will require a Notice to Proceed from the Department of <br />Planning and Development. <br />21. The mining operations shall be completed no later than September 18, 2007, <br />22. The site shall be reclaimed in accordance with the reclamation plan no later thou January 1, 2004. <br />All conditions must be satisfied prior to commencing any additional operations on the subject site. Once <br />these items have been addressed, staff will issue a notice to proceed. Stipulations are items, which run <br />with the approval of the application. These requirements shall be adhered to during the construction and <br />operation of your facilities. <br />If you have questions, or if we can be of further assistance, please do not hesitate to contact mr in our <br />office at (303) 853-7006. <br />Sincerely, <br />~~ <br />J~ amen A Hayes, CP <br />Planning lvfanager-Development <br />cc: case file {#PRJ2000-00036) <br />correspondence file <br />Ctephen P. Dunn, Development Engineer <br />Doren Duncan, Engineering Manager <br />Lary Haynie, Chief Building Official <br />Rick Anderson, Parks Planner <br />Craig Tessmer, Environmental Analyst <br />Banks and Gesso, LLC <br />Attn: Mr. Paul Gesso <br />720 Kipling St., #1 l7 <br />Lakewood, CO 80215 <br />enclosures: Draft Resolution from fhe Board of County Commissioners <br /> <br /> <br /> <br />