My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44501
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:16 PM
Creation date
11/23/2007 1:06:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/29/1982
Doc Name
SYNOPSIS OF JUNE 6 1982 MEETING BETWEEN COLO MLRD AND UTAH INTERNATIONAL
From
MLR
To
TRAPPER MINE
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br />Stipulation I~15 (Revegetation success). PILR has accepted the sample <br />adequacy methodology presented by U.I. Utah submitted information on <br />linear regression approach to success evaluation. PiLR will review this <br />material and discuss with Utah. Utah to incorporate changes stated in <br />June 21, 1.982 correspondence. <br />Cumulative Hydrologic Impact Study. Jerry Zimpfer and Dave Craig caill <br />be working on the additions to the Kaman - Tempo report during the <br />next two weeks. MLR has no copies of this report available to the public. <br />Post-Ptining Topography. Utah wished to submit this map/discussion with <br />other annual reports to the Division. This is acceptable. The requirement <br />for evaluation of swell factor on an annual basis may be rescinded upon <br />verification of projected swells. <br />Bonding. Bonding assumptions and calculations have been reviewed and <br />found acceptable. The total bond amount will be higher due to increased <br />equipment and operation costs based on the 1982 Rental Rate Blue Bonk. <br />The Division is striving toward the issuance of a proposed decision b~,~ <br />the end of July. To this end we will contact you as the need arises <br />to polish-up the document and tie loose ends. <br />If you have any questions, or if I have misrepresented our meeting please <br />contact me. <br />Sincerely, <br />,~G~S~~- <br />Michael S. Savage <br />Reclamation Specialist <br />MS: ep <br />cc: R. Blake, OSM <br />J. Pendleton <br />J. Zimpfer <br />D. Craig <br />F. Banta <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.