My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44436
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:14 PM
Creation date
11/23/2007 1:01:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
4/25/2003
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Phase I
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. PROPOSED DECISION <br />Based on the observations and findings above, the Division proposes to approve EFCI's request for a <br />Bond Reduction and Phase I Bond Release for the Southfield Mine. This proposed decision will <br />release the applicant from liability for backfilling, grading and drainage control/reestablishment on the <br />68.6 acres included in the proposed bond release area. This includes the portal and facilities area, the <br />coal stockpile area, Ponds 1 and 2 basins (including the "bone yazd"), the explosives bunker area, the <br />Newlin Creek topsoil stockpile, the roadside topsoil stockpile azea, the borrow area, topsoil stockpile <br />area and subsoil stockpile area, the rock dust storage tank, the Pond 3 area, the south fan area and the <br />refuse pile. <br />The Division also proposes to approve the bond reduction requested by EFCI. The bond reduction is <br />for $14,072.00. <br />The Division currently holds a performance bond of $914,443.00 for the Southfield Mine in the form <br />of corporate surety 16-66-96 from National Union Fire Insurance Company. The Division proposes to <br />release a total of $534,012.00 ($14,072.00 for the bond reduction and $519,940.00 for the bond <br />release). The remaining bond to be held by the Division will be $380,431.00. The estimated cost to <br />complete the reclamation at the Southfield Mine is $223,856.00 (see Exhibit P). The Division will, <br />therefore, hold enough bond monies to complete the required reclamation, if necessary. <br />Any person with a valid legal interest who might be adversely affected by this proposed decision may <br />request a formal public heazing before the Mined Land Reclamation Board in accordance with Rule <br />3.03.2(6). Public notice of this proposed decision will be published two times in The Canon City Daily <br />Record. Requests for a public heazing must be submitted to the Division in writing within thirty (30) <br />days of the first publication in The Canon City Daily Record. If no hearing is requested within thirty <br />days, the Division's decision will become final. <br />Southfield Mine Permit No. C-1981-014 <br />SIr2 Findings 33 25 April 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.