My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44414
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:12 PM
Creation date
11/23/2007 1:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
8/16/1982
Doc Name
Proposed Decision & Findings of Compliance for the Animas Mine
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• _2_ • <br />Proposed Decision <br />Sundance Coal Company <br />The Animas Mine <br />The Colorado Mined Land Reclamation Di vision proposes to approve, with <br />stipulations, an application for a permit to conduct coal mining submitted <br />by Sundance Coal Company for the Animas Mine. <br />This approval decision is based on a finding that the proposed operation <br />will comply with alt requirements of the Colorado Surface Coal Mining Recla- <br />mation Act, C.R.S. I973, as amended, 39-33-I01 et seq., and the Regulations <br />promulgated pursuant to the Act. <br />The permit application and the stipulations will become a binding part of <br />the permit upon approval. The stipulations for the Animas Mine are as <br />follows: <br />Stipulation No. I: <br />WITHIN 30 DAYS OF PERTIIT ISSUANCE, THE PERMITTEE SHALL INSTALL <br />A SEDIMENT MARKER IN THE SEDIMENTATION POND WHICH WILL CLEARLY <br />INDICATE TXE 60~ SEDIMENT STORAGE LEVEL. <br />Stipulation No. 2: <br />CdITHZN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE THE <br />DIVISION WZTN AN INSPECTION AND CONSTRUCTION REPORT WHICH IS <br />CERTIFIED BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER (RULE <br />9.05.6(7)). THE PERMITTEE MUST ALSD PROVIDE THE DIVISION WITH <br />QUARTERLY INSPECTION REPORTS FOR THE POND. <br />Stipulation No. 3: <br />WITHIN 30 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF <br />THE SEDIMENT COLLECTION AND DIVERSION DITCHES AT THE NORTHWEST <br />PORTION OF THE MINE, THE PERMITTEE PfUST DEMONSTRATE THAT THESE <br />DITCHES, AS DESIGNED, WILL BE STABLE UNDER FLOW CONDITIONS RESULTING <br />FROM THE THEORETICAL 10-YEAR, 24-HOUR STORM EVENT. IF TXE PERMZTTEE <br />CANNOT DEMONSTRATE COMPLIANCE, THE PERMITTEE FfUST, WITHIN THE TIfQE <br />PERIOD SPECIFIED ABOVE, SUBMIT NEW DESIGNS FOR THESE DITCH SEGMENTS <br />WHICH WILL BE STABLE UNDER THE 10-YEAR, 24-HOUR FLOW CONDITIONS. <br />ALL DEMONSTRATIONS AND DESIGNS SUBMITTED IN RESPONSE TO THIS STIPU- <br />LATION WILL BE SUBJECT TO REVIEW AND APPROVAL BY THE DIVISION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.