Highwall mining will not resuh in additional surface disturbance in the designated mining areas <br />since the coal will be removed by underground methods from the existing surface mine highwalls <br />and retention of adequate support pillars of un-mined coal wiA prevent ground collapse and <br />surface subsidence. - <br />4. Tvpe of Equipment on Site -The following major equipment units are being utilized for existing <br />surface mining and reclamation operations at the Seneca IIW Mine. In addition to this <br />equipment, specialized highwall mining equipment will be utilized to recovez additional coal <br />reserves prio*_ to fnal mine desire and reclamation. <br />Tracked Dozers (D-10/11} <br />Tractor Scrapers (637) <br />Overburden Drill <br />Electric Dragline (18 cy) <br />Coal Drill <br />Hydraulic Coal Loader <br />\X~heel- Loader (988/992) <br />Highwall Miner and Associated Surface Suppon Equipment <br />Haul Trucks (Contractor equipment -Bottom-Dump Tandem Tractor Trailer Units w/35 <br />ton trailers (70 ton total capacity)) <br />Motor Grader <br />Water Tmck <br />Reclamation Tractor and Implements <br />Equipment Se.-vice Truck <br />4w"D Pickups/Utility Veh ides <br />--------------------P-ortable-L-igheP-lanes- -- <br />Portable Pumps <br />5. T__pv e of Vehicles Used for Project -Refer to No. 4 above <br />6. Number of Em~oyees. Job Res~nsibi&ries and Workshifts -The highwall muting equipment <br />can be operated by a crew of 4 to 7 employees. Including management and maintenance staff, <br />highwall mining operations will employ approximately 20 employees on a,three-shift per day <br />operating basis. <br />7. Phasing Plan - Highwall mining operations for the Seneca TIW Mine will occur as the final phase <br />of [Wining prior to site reclamation. Contingent on powerplant requirements and coal production <br />demand, mining of remaining surface-mineable coal reserves is currently scheduled to be <br />completed over the next seven Veazs (2003-2010). Hlghwall mining will follow final surface coal <br />removal, as each acdve pit azea is mined-out, and be completed within six months to four yeazs. <br />8. Date of Commencement -Refer to No. 7 above <br />9. Completion Date - At current production rates, it is anticipated that final surface coal production <br />in the Seneca IIW Mining Atea will be completed by 2010. Highwall mining would follow <br />completion of active surface mining operations in each active pit azea, potentially extending the <br />period of active mining operations through 2014. <br />Reclamation operations would be initiated following completion of ail active mining in each <br />active pit area- Typically, reclamation is completed within approximately two yeazs following fmal <br />coal removal, initiating the mandatory 10-year reclamation liability period. <br />10. Locations of Stockpiles for Topsoil. Overburden. Etc. if Any -The only stockpiling that will <br />occur in conjunction with proposed highwall mining and related operations, will be temporary <br />stockpiling of coal on the active mining bench under those circumstances where direct loading of <br />hau a~e trucks from the hip iw -all miner may not e practic <br />W.IPN(eam.lr~ rery.rPr~.ALa Pm.J~?(O)CexNj.rUPAwM+mr <br />