My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44187
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:00 PM
Creation date
11/23/2007 12:53:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
1/7/1992
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VI. Operations on Alluvial Vallev Floors <br />The Division has determined that an alluvial valley floor exists <br />within the affected or adjacent area. Therefore, the following <br />findings are in order for the alluvial valley floor located on the <br />Whita River. <br />The Division finds that activities proposed by the applicant <br />will not interrupt, discontinue, or preclude farming on the <br />alluvial valley floors that are irrigated or naturally <br />subirrigated. (4.24.3(1)). <br />The proposed activities will not materially damage the <br />quantity or quality of water in the surface or ground water <br />system described above. (4.24.3(3) and 2.06.8(5)(a)(ii)). <br />The proposed activities will comply with the requirements of <br />the Act and the Regulations with respect to alluvial valley <br />floors. (2.06.8(5)(a)(iii)). <br />Surface coal mining and reclamation operations will be <br />conducted to preserve the essential hydrologic functions of <br />alluvial valley floors outside the permit area and to <br />reestablish the essential hydrologic functions of alluvial <br />valley floors within the affected area throughout the mining <br />and reclamation process. (4.24.2). <br />An environmental monitoring system shall be installed, maintained, <br />and operated by the permittee on all alluvial valley floors during <br />surface coal mining and reclamation operations and continued until <br />all bonds are released in accordance with Rule. 3. (4.24.4). <br />0563E/scg <br />_iq_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.