Laserfiche WebLink
Stipulation No. 9 <br />THE PERMITTEE SHALL RESAMPLE THE MUNGER CANYON BIG SAGEBRUSH <br />COMMUNITY FOR PRODUCTION DURING THE 1983 GROWING SEASON. THE <br />SAMPLING SHALL BE OF AN INTENSITY TO MEET SAMPLE ADEQUACY <br />REQUIREMENTS OF THE DIVISION. THE RESULTS OF THE SAMPLING <br />SHALL BE SUBMITTED TO THE REGULATORY AUTHORITY NO LATER THAN <br />30 DAYS AFTER THE COMPLETION OF SAMPLING AND BEFORE SEPTEMBER <br />30, 1983. <br />Stipulation No. 10 <br />THE PERMITTEE SHALL SUBMIT TO THE REGULATORY AUTHORITY A <br />DEMONSTRATION OF THE REPRESENTATIVENESS OF THE VEGETATIVE <br />SAMPLING FOR THE VEGETATIVE COMMUNITIES AT THE MUNGER CANYON <br />SITE. THIS DEMONSTRATION SHALL ADDRESS RAINFALL AMOUNT AND <br />SEASONALITY FOR THE YEAR OF VEGETATION SAMPLING AND THE TWO <br />PREVIOUS YEARS AND COMPARE THIS INFORMATION TO MEAN PRE- <br />CIPITATION AMOUNTS AND SEASONALITY FOR THE LOCATION. THIS <br />UEMONSTRATION SHALL BE SUBMITTED 60 DAYS AFTER PERMIT <br />ISSUANCE. <br />Stipulation No. 11 <br />THE PERMITTEE SHALL SUPPLY THE REGULATORY AUTHORITY WITH WOODY <br />PLANT DENSITY DATA FOR ALL SAMPLED COMMUNITIES TO INCLUDE, BUT <br />NOT BE LIMITED T0, SAMPLE SIZE, SAMPLE MEAN, SAMPLE VARIANCE, <br />AND LEVEL OF CONFIDENCE ACHIEVED. IF SAMPLING ADEQUACY IS NOT <br />MET, THE PERMITTEE WILL BE REQUIRED TO RESAMPLE AS NECESSARY <br />DURING THE 1982 GROWING SEASON. THIS INFORMATION SHALL BE <br />PkOVIDED TO THE DIVISION WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 12 <br />THE PERI~1ITTEE WILL PROVIDE JUSTIFICATION FOR THE PROPUSEU <br />STOCKING LEVELS FOR WOODY PLANT SPECIES TO THE REGULATORY <br />AUTHORITY AND THE REGULATORY AUTHORITY AND PERMITTEE WILL <br />DETERMINE ACCEPTABLE LEVELS WITHIN 3 MONTHS AFTER PERMIT <br />ISSUANCE. <br />Stipulation No. 13 <br />THE PERMITTEE AND THE RE GULNTORY AUTHORITY WILL JOINTLY <br />DETERMINE A METHOD ANU <br />WOODY PLANT DENSITY AND <br />OF PERMIT ISSUANCE. <br />Stipulation No <br />STANDARDS FOR THE EVALUATION OF <br />SPECIES DIVERSITY WITHIN 90 DAYS <br />THE PERMITTEE SHALL DEVELOP AN ANNUAL REVEGETATION MONITORING <br />PROGRAM WHICH WILL MONITOR THE SUCCESS OF REVEGETATION EFFORTS <br />AT THE MUNGER CANYON SITE, TO BE APPROVED BY THE REGULATORY <br />AUTHORITY WITHIN 3 MONTHS AFTER PERMIT ISSUANCE AND INITIATED <br />THE SECOND YEAR AFTER THE INITIAL REVEGETATION SEEDING. <br />Stipulation No. 15 <br />THE PERMITTEE WILL CONDUCT AN AERIAL RAPTOR SURVEY WITHIN TWO <br />SEASONS OF PERMIT ISSUANCE. SEASONS ARE DEFINED AS THE PERIODS <br />BETWEEN JULY 1 AND JULY 15, 1983 AND BETWEEN JULY 1 AND JULY 15, <br />1984. THE AREA FOR THE SURVEY MUST INCLUDE ALL OF THE AREA <br />WITHIN A TWO MILE RADIUS OF THE MCCLANE CANYON AN MUNGER CANYON <br />MINE DISTURBED AREAS. THIS SURVEY IS TO BE CONDUCTED IN <br />CONJUNCTION WITH THE U. S. FISH AND WILDLIFE SERVICE ANU RESULTS <br />MUST 8E SUBMITTED TO THEM AND TO THE REGULATORY AUTHORITY WITHIN <br />30 DAYS OF COMPLETION OF THE STUDY. <br />Stipulation No. 16 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT <br />A PLAN TU THE REGULATORY AUTHORITY FOR APPROVAL PROPOSING THE <br />INSTALLATION OF A STRUCTURE THAT WOULD DEMONSTRABLY DISSIPATE <br />THE ENERGY OF FLOW IN THE CHANNEL SUCH THAT EROSION OF THE <br />CHANNEL WILL NOT OCCUR. <br />