Laserfiche WebLink
<br />-~- <br /> <br />RIDER TO MINING PERMIT (CONTINUED) <br />Stipulation No. R3 <br />DUE TO THE RE-CALCULATED VOLUME OF THE TEMPORARY OVERBURDEN STOCKPILE, <br />AND DUE TO THE POSSIBILITY OF NOT OBTAINING THE SUDDUTH LEASE, KERR <br />qq COAL MUST DEMONSTRATE WITHIN 90 DAYS OF PERMIT RENEWAL THAT <br />I~U APPROXIMATE ORIGINAL CONTOUR CAN BE ACHIEVED. THIS SUBMITTAL MUST <br />INCLUDE ALL APPLICABLE MAPS, TABLES, FIGURES, AND PERTINENT <br />CALCULATIONS TO FULLY DEMONSTRATE THE ACHIEVABILITY OF AOC. <br />Stipulation No. R4 <br />KERR COAL COMPANY HAS SUBMITTED A DETAILED BONDING LIABILITY COST <br />ESTIMATE IN RESPONSE TO THE DIVISION'S PRELIMINARY DETERMINATION. THE <br />DIVISION IS REVIEWING THE BONDING LIABILITY COST ESTIMATE SUBMITTED BY <br />KERR COAL, AND THE DIVISION, IN CONJUNCTION WITH KERR COAL, SHALL MAKE <br />(1~ A DETERMINATION OF THE PROPER COST ESTIMATES TO BE USED IN <br />ESTABLISHING THE TOTAL BOND AMOUNT AS SOON AS PRACTICABLE. THEREFORE, <br />THE TOTAL BOND FOR THE MINE SITE (FIRST INCREMENT) IS SET AT <br />54,290,800.00, AND KERR COAL SHALL MAINTAIN A BOND IN THAT AMOUNT IN <br />FULL FORCE AND EFFECT; BUT NOT LATER THAN SIXTY (60) DAYS AFTER THE <br />ISSUANCE OF THE DIVISION'S DECISION ON THE PERMIT RENEWAL, THE <br />DIVISION SHALL MAKE A DETERMINATION OF ADDITIONAL AMOUNTS WHICH MAY BE <br />REQUIRED, IF ANY, FOR THE KERR COAL MINE SITE. <br />ACCEPTED AND AGREED: t4INED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br /> <br />B~ <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />(Rev. 1/83) <br />Doc. No. 243 <br />