My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44104
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:57 PM
Creation date
11/23/2007 12:50:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
7/22/1986
Doc Name
MINING PERMIT (Dated 7/10/86 to 7/10/91) Should have been 3/20/86 to 3/20/91)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />-6 - <br />RIDER TO MINING PERMIT <br /> <br />Permit Date ,}~~ 7p 19~ Permit No. C-80-006 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />1" Stipulations 1 through 3 are ongoing from the previous permit period. <br />~^s.iy~ Stipulations R1 through R4 have been generated through the renewal process. <br />ra~r5 <br />S~~Q Stipulation No. 1 <br />~5 ~ KERR COAL IS REQUIRED TO CONSTRUCT ALL DITCHES USING THE DESIGN GRADES <br />RATHER THAN THE GRADES SHOWN ON MAP 16a. IF THIS REQUIRES RELOCATING <br />r , ANY DITCHES FROM THE LOCATION SHOWN ON THE MAP, THEN A REVISED MAP 16a <br />MUST BE SUBMITTED AT THAT TIME. <br />Stipulation No. 2 <br />KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS <br />DATA FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE <br />816-124 OF THE ORIGINAL APPLICATION TO DETERMINE WHETHER FUTURE <br />) ' OPERATIONAL EXPERIENCE IS CONSISTENT WITH THE PROJECTED SWELL FACTOR <br />OF 24%. <br />Stipulation No. 3 <br />NO LATER THAN 90 DAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF <br />OPERATIONS ON THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 46) KERR <br />COAL MUST SUBMIT DETAILED WORST CASE RECLAMATION COST ESTIMATES TO THE <br />DIVISION FOR REVIEW. ANY REQUIRED ADDITIONAL BOND AMOUNT MUST BE <br />SUBMITTED AND APPROVED PRIOR TO THE COMMENCEMENT OF OPERATIONS ON THAT <br />INCREMENT. A SIMILAR PROCEDURE SHALL BE FOLLOWED FOR ANY SUBSEQUENT <br />INCREMENTS. <br />Stipulation No. R1 <br />THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A YEARLY REPORT ON <br />THE PROGRESS OF ALL HYDROLOGIC MONITORING WHICH INCLUDES ALL DATA <br />COLLECTED FOR THAT YEAR AND A DISCUSSION ON ANY CONCLUSIONS WHICH CAN <br />BE DRAWN FROM THE DATA. <br />Stipulation No. R2 <br />KERR COAL COMPANY WILL SUBMIT ALL APPLICABLE MAPS, TABLES, AND TEXT <br />WHICH DESCRIBE THE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS <br />AND RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED DURING THE <br />FORTHCOMING PERMIT TERM. THIS INFORMATION MUST BE FULLY SUBMITTED <br />WITHIN 90 DAYS OF PERMIT RENEWAL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.