Laserfiche WebLink
<br /> <br />-6 - <br />RIDER TO MINING PERMIT <br /> <br />Permit Date ,}~~ 7p 19~ Permit No. C-80-006 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />1" Stipulations 1 through 3 are ongoing from the previous permit period. <br />~^s.iy~ Stipulations R1 through R4 have been generated through the renewal process. <br />ra~r5 <br />S~~Q Stipulation No. 1 <br />~5 ~ KERR COAL IS REQUIRED TO CONSTRUCT ALL DITCHES USING THE DESIGN GRADES <br />RATHER THAN THE GRADES SHOWN ON MAP 16a. IF THIS REQUIRES RELOCATING <br />r , ANY DITCHES FROM THE LOCATION SHOWN ON THE MAP, THEN A REVISED MAP 16a <br />MUST BE SUBMITTED AT THAT TIME. <br />Stipulation No. 2 <br />KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS <br />DATA FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE <br />816-124 OF THE ORIGINAL APPLICATION TO DETERMINE WHETHER FUTURE <br />) ' OPERATIONAL EXPERIENCE IS CONSISTENT WITH THE PROJECTED SWELL FACTOR <br />OF 24%. <br />Stipulation No. 3 <br />NO LATER THAN 90 DAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF <br />OPERATIONS ON THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 46) KERR <br />COAL MUST SUBMIT DETAILED WORST CASE RECLAMATION COST ESTIMATES TO THE <br />DIVISION FOR REVIEW. ANY REQUIRED ADDITIONAL BOND AMOUNT MUST BE <br />SUBMITTED AND APPROVED PRIOR TO THE COMMENCEMENT OF OPERATIONS ON THAT <br />INCREMENT. A SIMILAR PROCEDURE SHALL BE FOLLOWED FOR ANY SUBSEQUENT <br />INCREMENTS. <br />Stipulation No. R1 <br />THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A YEARLY REPORT ON <br />THE PROGRESS OF ALL HYDROLOGIC MONITORING WHICH INCLUDES ALL DATA <br />COLLECTED FOR THAT YEAR AND A DISCUSSION ON ANY CONCLUSIONS WHICH CAN <br />BE DRAWN FROM THE DATA. <br />Stipulation No. R2 <br />KERR COAL COMPANY WILL SUBMIT ALL APPLICABLE MAPS, TABLES, AND TEXT <br />WHICH DESCRIBE THE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS <br />AND RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED DURING THE <br />FORTHCOMING PERMIT TERM. THIS INFORMATION MUST BE FULLY SUBMITTED <br />WITHIN 90 DAYS OF PERMIT RENEWAL. <br />