My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44040
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:54 PM
Creation date
11/23/2007 12:47:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980037HR
IBM Index Class Name
General Documents
Doc Date
1/10/1991
Doc Name
Intermittent Status Request
From
DMG
To
TM Russell
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~: <br />f. <br /> <br /> <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1373 Sherman St., Room 275 <br />Denver, CO 80203 <br />303 866-3567 <br />Fa x: 303 832-8706 <br />pF' ~O(D <br />alp <br />t<~ RHO <br />•~ <br />t <br />'~ /8'16 ~ <br />Roy Romer, <br />Governor <br />Fretl R. Banta, <br />Division Director <br />January 10, i99i <br />Mr, T.M. Russeli <br />P.0. Box 906 <br />La Porte, Colorado 80535 <br />RE: Intermittent Status-Request, T,M. Russell and R,C. Barger, <br />Ingleside Quarry, Permit No. M-80-037-HR <br />Dear Mr. Russell: <br />On October 25, 1990, we received your request to place the Ingleside Quarry on <br />intermittent status. Before we may approve your request, we need some <br />information on the following items: <br />1. Please provide the estimated volume of mineral reserves left <br />unmined within your permit boundary, <br />2. Please describe the amount of area that has been affected by your <br />operation. Please break this down by areas of major operations <br />such as: <br />a, Pit floor, 6 acres: <br />b, Highwalls, 3 acres; <br />c, Structures and processing facilities, 1 acre; <br />d, Access roads, 2 acres; <br />e, Material, overburden and toposil stockpiles; 2 acres; <br />f, Equipment storage and vehicle maintenance areas, 2 acres. <br />3. Please discuss whether any areas affected by your operation have <br />been partially or fully reclaimed, If any reclamation has <br />occurred, please describe what this activity was and when it was <br />performed. <br />4. Please describe the material and volumes of all stockpiles on your <br />site, such as: <br />a, Topsoil, 100.000 cy <br />b. Overburden, 300,000 cy <br />c. High grade rock, 50,000 cy <br />d. Low grade rock, 100,000 cy <br />e. Crusher fines, 25,000 cy <br />f. Oversized boulders, 15,000 cy <br />STATE OF COLuxAllO <br />
The URL can be used to link to this page
Your browser does not support the video tag.