My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43949
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:44 PM
Creation date
11/23/2007 12:43:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
1/26/1996
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Term Review <br />Red Canyon Mine, Permit No. C-81-034 <br />INTRODUCTION <br />This document presents the results of the Division's mid-term <br />review for the Red Canyon Mine. The current "reclamation only" <br />permit was renewed July 16, 1993, and expires July 13, 1998. This <br />review was conducted to fulfill the requirements of Rules 2.08.3, <br />2.06.2(10), 2.06.3(4), 2.06.5(3), 2.06.7(5), and 3.02.2(4). The <br />review consisted of a review of the permit application package, <br />previous findings documents, annual hydrology reports, revisions, <br />stipulations, bond release approvals, and inspection reports and <br />enforcement actions issued since the most recent permit renewal. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental <br />practices, mountaintop removal variances, steep slope variances <br />from AOC, and variances from contemporaneous reclamation for <br />combined surface and underground mining be reviewed by the Division <br />where applicable. None of these categories apply to the Red Canyon <br />operation. <br />Rule 2.08.3 requires that the Division conduct a review of each <br />permit issued prior to its mid-term. Based on this review, for <br />good cause shown, the Division may require reasonable revision or <br />modification of the permit provisions to ensure compliance with the <br />Act and Regulations. See Section III of this document. <br />Rule 3.02.2(4) requires that the Division review the amount of the <br />bond and the terms of acceptance of the bond every 2 1/2 years. <br />See Section IV of this document. <br />The document is organized as follows: Section I is a brief mine <br />status review. Section II summarizes revisions to the permit since <br />the last renewal and lists any stipulations and responses since <br />renewal. Section III is a summary of any changes or revisions that <br />need to be made to the permit and the justification for those <br />changes. Section IV discusses the current state of the bond <br />liability and the reclamation bond. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.