-' C <br />Steven E. Westbay July 23, 1996 <br />Re: Relocation of Office, Shop, and Warehouse <br />The desired schedule for the work would be to remove the existing <br />stored materials and the storage shed in the East Yard during <br />August. In September, we would finish site preparation, install <br />water, power, septic tank, and leach field, and pour the concrete <br />pads for the shop and warehouse. In October and November, the <br />buildings would be installed and finished in time to be occupied <br />for the winter. <br />Following move in, including relocation of the mine monitoring <br />system currently in the existing shop, the large shop and warehouse <br />could be removed and the site clean-up would be completed, as <br />weather allows. Construction and relocation of the office is not <br />planned until at least next year. <br />Thank you for your assistance with development of our plans. As we <br />have discussed previously, it is my intention to keep you informed <br />as early as possible of any developments at the mine. I am certain <br />we can cooperate fully with you to facilitate the process of <br />obtaining all county approvals. <br />Sincerely, <br />~_. <br />i .~~W-72u u~-4-- ~ <br />Thomas C. Anderson, P.E. <br />Environmental Coordinator <br />cc: David A. Berry <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />XBOW 2 <br />