Laserfiche WebLink
4. Allow the cement to set and tag the cement to verify the cement is <br />above the parted casing. <br />5. If the cement plug has been established above the parting, fill the 7" <br />casing to the surface with cement. <br />6. If a cement plug has not been established above the parting, addition <br />cement will be pumped until a cement plug can be established above <br />the parted casing. <br />7. Fill the 7" casing with cement to the surface. <br />Should you have any questions or require more information concerning this matter <br />please contact me at 970-285 -0407. <br />Sincerely, <br />Ed Cool y~ <br />Environmental Health <br />and Safety Manager <br />cc: Elisabeth Evans/EPA <br />Kent Walter/BLM <br />