Laserfiche WebLink
16. Pages 2.05.4(2)(c)5,6: The designs for the reclaimed drainage channel indicate the <br />base width of the trapezoidal channel to be 30 feet wide. Although this design is <br />mathematically correct, the actual field installation of this design may be almost <br />impossible to accomplish. Redesign of this channel section may be in the best interest <br />of the mine. <br />17. Map 2.04.7-1: This map needs revision to show actual conditions. <br />Section V - BondinP Summary <br />The Division currently holds $1,550,000.00 in a Corporate Surety Bond for the reclamation <br />performance bond at the New Horizon Mine. The Division has recalculated the worst case <br />bond scenario to include changes to the mining plan and the addition of new facilities <br />utilizing current cost rates. The revised estimate for both mines is $1,511,678 therefor the <br />current bond amount is sufficient to perform all remaining reclamation activities. <br />\MIDTERM.OOR <br />Midterm Review - New Horizon Mine 5 November 1995 <br />