Laserfiche WebLink
<br />Mr. Jake Kauffman Page 3 <br />April 2, 1992 <br />6. All water must be delivered as proposed. The delivery must be made through <br />measuring devices satisfactory to the Division Engineer. <br />If at any time insufficient replacement water is available additional replacement <br />water must be obtained. <br />8. The name, address, and phone number of a contact person who will be <br />responsible for the operation and accounting of this plan must be provided to the <br />Water Commissioner and Division 1 Engineer. <br />9. This substitute water supply plan may be revoked or modified at any time should <br />it be determined that injury to other vested water rights has or will occur as a result <br />of the plan. <br />This plan shall become effective through March 1,1993 upon receipt of a response from you <br />accepting the terms in this approval letter. ff this plan is not made absolute by a court action by <br />the expiration date, an annual renewal of the plan is required. Please contact Bill Mclntrye in <br />Denver at 866-3585 or Alan Berryman in Greeley at 352-8712rfyouhave any questions concerning <br />this approval. <br />Sincerely, <br />al D. Simpso , P.E. <br />~~-~~ <br />Acting State Engineer <br />HDS/JTS/jIUM7i3327 <br />cc: Alan Berryman, Division Engineer <br />Donald Brazelton, Water Commissioner <br />Steve Lautenschlager <br />