Laserfiche WebLink
<br />GEyEn;.~ I~„r.:E.,..~CONUIiIUhiS (li.i"C,~,., _ .,. ~.,~Ubj <br />• 1. This permit is issued in rc':c-ce uocn the accuracy and completeness of information <br />supplied by the apc; :,~,~t cnd a conditioned upon cen~:ruct~on, installation and operation <br />,-... _.;,r~~ance ~:~it~ , i„ in~oi matiun anu wish rEt,r~: -,,.. ,,,,~ ~.~ m.,~j~ .,y the applicc: ~: ~-its <br />Oyu.,,... <br />2. This permit is valid only for the egwpment and operaunns specifically ioen~iiiad'neie~~,. <br />3. Each and every condition ct tms permit is a material part hereoT and is not severable. Any <br />challenge to, or appeal of, a condition hereof shall constitute a rejection of the entire permit <br />and upon such occurrence this permit shall be deemetl denied ab initio. <br />4. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division (APCD) on grounds set forth in the Colorado Air puality Control Act and <br />regulations of the Air Quality Control Commission (AQCC), including failure to meet any <br />express term or condition of the permit. <br />5. This permit must be retained and made available for inspection upon request at the <br />_ location set Ertl-i tf-erem~Vitti-respect to a po7labl~source~hich~s~rtwedto~a new- - . <br />- -tocatidn; a copy of the revised Air Pollutant Emissions Notice (APEN) (required by law to <br />be submitted to the APCD whenever a portable source is relocated) should be attached to <br />this permit. The permit may be reissued to a new owner as provided in Section III.B. of <br />AQCC Regulation No. 3 upon transfer of ownership. <br />6. Initial approval of an emission permit does not provide "final" authority foroperation of this <br />source. Final approval of the permit must be secured from the APCD in writing in <br />• accordance with the provisions of C.R.S. 1973, Section 25-7-114(4)(j) and Section IV.H. of <br />_ AQCC Regulation No. 3_ Final approval cannot be granted until construction iscompleted <br />- and operation and construction have been verified by the APCD as conforming in all <br />respects with the conditions of the initial approval permit. <br />7. You MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to <br />commencement of the permitted operation or activity. Failure to do so is a violation of <br />C.R.S. 1973, Section 25-7-114(4)(j) and Regulation No. 3., Section IV.H.1.,and can result in <br />the revocation of the initial approval permit. <br />8. You MUST obtain final approval within six months of the commencement of operation as <br />that term is defined by the AQCC. Failure to obtain final approval will result in the <br />revocation of the initial approval permit. <br />9. If the APCD determines that the terms and conditions of the initial approval permit have <br />been satisfied, the APCD will issue a final approval permit, which does constitute "final" <br />authority to operate as discussed in Paragraph 6 above. <br />10. Violation of the terms of a final approval permit or of the provisions of the Colorado Air <br />Quality Control Act or the regulations of the AQCC may result in administrative, civil or <br />criminal enforcement actions under C.R.S. 1973. Sections 25-7-115 (enforcement), 25-7- <br />121 (injunctiohs), 25-7-122 (civil penalties) and 25-1-114 (criminal penalties). <br />11. Unless specifically stated otherwise, the general and special conditions contained in <br />this permit have been determined by the APCD to be necessary to assure compliance <br />• with the provisions oT C.R.S. 1973, 25-7-114(4)(8) and, as such, shall be enforceable <br />under the provisions of C.R.S. 1973, 25-7-115 after final approval of the permit has been <br />granted: <br />