Laserfiche WebLink
CGRS, Inc. <br />QA/QC procedures should provide details relating to the schedule, information [o be provided, and the <br />mechanism for reporting to [he project manager. Reports to the project manager should include <br />• Periodic assessment of measurement data accuracy, precision, and completeness; <br />• results of performance audits; <br />• Results of system audits; <br />• Significant QA/QC problems and recommended solutions; and <br />• Resolutions of previously stated problems. <br />The individual responsible for preparing [he periodic reports should be identified. These reports should <br />contain a separate QA/QC section that summarizes data quality information. The Quality Assurance Project <br />Plan is presented as Attachment C. <br />5.0 REMARKS <br />The scope of work is based upon current available information and our understanding of this project. As the <br />project develops, changes [o the project scope of work may be required. If changes in the scope of work are <br />dictated by the needs of the project, these changes will be presented prior to implementation. <br />This report was prepared by CGRS, [NC. <br />Reviewed by: <br />Chester itchens, P.G. <br />Senior Hydrogeologist <br />Date~~ ~~ <br />Datc (~~ai <br />7 <br />