Laserfiche WebLink
Mr. Dave Stout - 5 - April 15, 1985 <br />2. Additional information is required with respect to road <br />drainage. Data to substantiate the assertion that <br />culverts or ditch relief are not needed should be <br />supplied. A plan to dissipate flow energy from the toe <br />slope ditch should also be submitted. <br />3. A more detailed topsoil salvage plan is required. <br />Calculations of suitable topsoil salvage volumes and <br />redistribution depths should be included. <br />4. The timetable for reclamation of the old road also needs <br />to be addressed. The existing bond for the Golden Eagle <br />mine will be considered sufficient only if the old road <br />is reclaimed immediately following construction of the <br />new road. If immediate reclamation is to occur, then <br />access to the air shaft (intake) and topsoil stockpiles <br />needs to be addressed as part of the reclamation plan. <br />Simultaneous use of both roads will require additional <br />bond. <br />If you have any questions, please contact me at the Division. You may <br />wish to arrange a meeting to facilitate discussion of these questions. <br />Sincerely, <br />~~ o~_ <br />Jeffrey Deckler <br />Reclamation Specialist <br />JD/eeb <br />Doc. No. 9122 <br />