My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43276
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:05 PM
Creation date
11/23/2007 12:18:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
5/15/1996
Doc Name
MEMO RECLAMATION SUMMARY GOLD HILL MILL PN M-94-117
From
HENRY SAUER
To
KEN KLOSKA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Native Gass S i c <br />Mountain Muhly <br />Slender Wheatgtass <br />Thurber Fescue <br />introdLCp~ Grass . i c <br />Hard Fescue <br />Intermediate Wheatgtass <br />Orchard Grass <br />Red Fescue <br />Smooth Brome <br />Timothy <br />r~ <br />L <br />Anolication Rate Lbs./ac. <br />2 <br />8 <br />3 <br />4 <br />8 <br />6 <br />2 <br />5 <br />2 <br />5. The grasses will be planted in either the late fall or early spring months. (Item <br />1) <br />6. A sprinkler irrigation system will be used to avoid dehydration of the two seed <br />beds during each of the grass seed gemination periods. (Item 1) <br />7. Some additional fertilizer will also be applied during the fast two or three <br />tears following the revegetation of each part of the tailings stomwater <br />retention structure. (Item 1) <br />2.7.1.3 Reclamation of the Surface of the Tailings <br />1. During this period of tailings consolidation, a wood fiber mulch will be <br />applied to the dried areas on the top of the tailings retention structure... (Item <br />1) <br />2. COM Inc. will commit to the installation of a layer of geotextile fabric over <br />the tailings surface before the rock is placed. Installation costs will be added <br />to the reclamation cost estimates. (Item 3: Apri128, 1995) <br />3. The borrow area for material to Wise the tailirgs dam and for a capillary <br />barrier on top of the tailings will come from the area behind the tailings dam <br />that will be part of the ultimate pond area. The borrow area has already had <br />topsoil removed. All material that is to be used in the tailings dam will be <br />appropriately characterized for use. (Item 3: April 28, 1995 & Item 3: May 2, <br />1995) <br />4. A low pyritic "grade rock cover" will be excavated from the borrow area and <br />stockpiled above Ute borrow area for use during reclamation. The borrow <br />Seed Mixture (Item 1) <br />~~.~..~.m Golder {lssoctafes <br />
The URL can be used to link to this page
Your browser does not support the video tag.