My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43205
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:00 PM
Creation date
11/23/2007 12:15:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/30/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase :[Vc Summary No. 19 Page 2 043-2170 <br />southeastern portion of the VLF, SLF material was tested, conditioned, reworked, retested, and <br />maintained prior to SLF surface acceptance. <br />Ames completed excavation of the Phase Nc anchor trench on the eastem section of the Phase Nc <br />VLF. Ames excavated approximately 150 feet of anchor trench in prepazation for geomembrane <br />installation during this reporting period: <br />Ames continued production of Drain Cover Fill (DCF) material at the screen plant by the secondary <br />crusher. <br />Poly-Flex completed deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />Nc OSA. Geomembrane was installed in the Phase Nc OSA on the southeast facing slope of Raven <br />Hill downwazd to the Phase Nb/IVc tie-in. Poly-Flex deployed 80-mil single-sided textured LLDPE <br />geomembrane over an area of approximately 67,783 squaze feet in the Phase Nc OSA during this <br />reporting period. Geomembrane panels C-796 through C-811 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion and extmsion seam samples DFc-291 through DFc-296 and DXc-31 <br />were marked and removed. Destructive fusion and extmsion seam peel and sheaz testing on samples <br />DFc-291 through DFc-296, and DXc-31 were performed and passed per project specification. <br />Ames continued hauling, placement and grading of DCF material into the Phase Nc OSA in the central <br />and eastern sections of the VLF, Raven Hill area. Ames placed DCF material and High Volume <br />Solution Collection (HVSC) piping per the project plans onto approved geomembrane panels. <br />A map of the azea worked during this reporting period is provided in Attachment C. <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase Nc earthworks. All constmction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed the excavation and construction of the LDT in the Phase Nc VLF for french <br />dimensions (1' wide by 1' deep), slope, and materials used. <br />Golder observed excavation of the Phase Nc anchor trench for proper location, dimension (2' wide by <br />3' deep) and maintenance prior to geomembrane deployment. Anchor trench excavation met or <br />exceeded the requirements of the specification. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase Nc OSA for <br />subgrade preparation, thickness, compaction, moisture-content, and materials used. The Golder CQA <br />Earthworks Monitor performed four nuclear moisture-density tests (SLNc-241 through SLNc-244) and <br />performed two nucleaz moisture-density retests (SLNc-241a and SLNc-242a). Field test results are <br />presented in Attachment B. <br />maze rv~~9sRR~~nR ~zs~:~t<. ~szooa Golder Associates lnG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.