Laserfiche WebLink
_- -Golder <br />-Associates <br />September 24, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />13E: Summary No. 19: September 12 through September 18, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of September 12 <br />through September 18, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 36° F to 50° F, and highs ranged from 70° F to 78° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Constuction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on five days of this seven-day <br />reporting period (September 13 through September 17, 2004). Poly-Flex conducted Phase IVc <br />construction activities on six days of this seven-day reporting period (September 13 through September <br />18, 2004). <br />PhaselVc <br />Ames completed Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase IVb / <br />Phase Nc tie-in area above the LOB. <br />Ames completed excavation and construction of two Leak Detection Trenches (LDT) and continued to <br />excavate and construct the LDT extensions on the eastern portion of the Phase IVc VLF. Ames <br />constructed approximately 100 feet of LDT trench and extension during this reporting period. <br />Ames placed, and compacted Soil Liner Fill (SLF) material into the Phase IVc OSA, on the <br />Phase Nc 19 September 12-September 18, 2004 043-2170 <br />