Laserfiche WebLink
8 <br />I Sep. '95 Board order to commence site reclamation by 28 July 1995 vacated. <br />l4 Sep. '95 DMG (A. Sorenson) Itr to File /l M-94-1 17 (Gold Hill Mill tile) recording COME <br />(R. Mason) report on Hazel A water level. Ltr reiterates anear-zero water level <br />requirement in Hazel A and warns of an impending inspection on 25 Sept. (995, <br />with possible NOPV resulting if due diligence on pumping is not demonstrated. <br />14 Sep. '95 CDPHE, Stormwater Management Division (D. M. Beley) Itr to COM, Inc. (G. <br />Fraser); third request for SWMP, noting tmes up to $lOK/day for violations of <br />State req'ts. <br />15 Sep. '95 COME (R. Mason) Itr to DMG (A. Sorenson) documenting l4 Sept. telecon (see <br />Sorenson Itr to File above). <br />15 Sep. '95 CDPHE, Haz. Mat. Division (S. Laudeman) Itr to COM, Inc. (T. Hartley) <br />requiring documentation of the removal of wastes from the millsite; such <br />documentation to include a narrative description of waste removal to a permitted <br />landfill, characterization, including lab analyses, of oil contaminated soils, and <br />manifests documenting waste transport. Haz. Mat. Division to be notified at least <br />three days prior to waste removal; representative of Haz. Mat. Div., DMG, <br />BCHD, or Town of Gold Hill to he present at removal. (We have not been able <br />to establish that any such notice was provided to any of the named agencies prior <br />to the removal which has already occurred.) <br />27 Sep. '95 DMG (A. Sorenson) Itr to Dufford and Brown, P.C. (R. Fanyo) subject: bond <br />reduction request. COME follow up required within compliance review period, <br />probably to oppose any such reduction at this time (i.e. pending full and complete <br />compliance with all outstanding Board/Staff direction). We need to he satisfied <br />that all legally possible environmental remedies have been fully underwritten by <br />the bond level established. <br />9 Oct. '95 lnppection of Hazel A and general millsite today shows partial earth hacktill of <br />entrance to Hazel A around a piece of used culvert, with a lockable steel door. <br />Water level behind bulkhead shows about four feet freeboard, about two to two <br />and 1/2 feet of water and solids. Bulkhead is leaking some; moisture is showing <br />in backfilled earth outside adit. Deadline for required lined coffer dam and <br />pump-back system appears not to gave been met. Action: Call DMG to <br />identify situation. <br />