Laserfiche WebLink
Section III <br />Status of Stipulations <br />The stipulation history for the Golden Eagle mine was reviewed as part of the mid-term <br />review. The following is a discussion of the stipulations that were noted as active in the <br />database, or issued as a result of the last permit renewal (RN-03). Review included <br />investigation of the stipulation response file, revisions to the permit, and the findings document <br />for RN-03. Stipulations are a binding part of the permit and previously assigned stipulation <br />numbers are not to be re-used. Any stipulations associated with this permit and issued over the <br />life of this operation which are not discussed in this mid-term review have been complied with <br />or terminated. <br />At the time of this midterm permit review, there are no active or un-resolved stipulations to [he <br />Golden Eagle mining permit. <br />